2022 Street Maintenance
W 4th St. and N. Main St., Taylor, TX, 76574
2022 Street Maintenance is a renovation/alteration project at W 4th St. and N. Main St., Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $80K across about 58,000 sq ft.
- Estimated project value
- $80K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 58,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 10 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
37 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
305 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76574 (Taylor)
One email per change. Unsubscribe in one click. Privacy.
2022 Street Maintenance is a Renovation/Alteration project located at W 4th St. and N. Main St., Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $80K covering 58,000 sq ft. City of Taylor is the property owner and HDR Engineering, Inc. is the design firm of record. The project was registered with TDLR on May 25, 2023.
Frequently Asked Questions
What is 2022 Street Maintenance?
2022 Street Maintenance is a renovation/alteration project at W 4th St. and N. Main St. in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction/rehab of 2nd St., 4th Street, and Mallard Ln. including curb & gutter, curb ramps, reclamation, seal coat, reconstruction, sidewalk, pavement markings and metal beam guard fence replacement.
Is 2022 Street Maintenance open in Taylor?
Construction on 2022 Street Maintenance is complete — TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is 2022 Street Maintenance located?
2022 Street Maintenance is located at W 4th St. and N. Main St., Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of 2022 Street Maintenance?
City of Taylor is the property owner/developer of record for 2022 Street Maintenance, per its TDLR project registration.
Who is the architect or design firm for 2022 Street Maintenance?
HDR Engineering, Inc. is the design firm of record for 2022 Street Maintenance, according to its TDLR filing.
How much does 2022 Street Maintenance cost and how big is it?
2022 Street Maintenance has an estimated construction value of $80K and approximately 58,000 square feet (about $1/sqft), based on its TDLR filing.
Scope of Work
Reconstruction/rehab of 2nd St., 4th Street, and Mallard Ln. including curb & gutter, curb ramps, reclamation, seal coat, reconstruction, sidewalk, pavement markings and metal beam guard fence replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
W 4th St. and N. Main St., Taylor, TX, 76574
Related Projects
Same Owner
$19.4M totalWatch all construction in 76574 (Taylor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Taylor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.