2022 Street Maintenance
2022 Street Maintenance is a renovation/alteration project at W 4th St. and N. Main St., Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2024). The project has an estimated value of $80K across about 58,000 sq ft.
๐Project Metrics
TDLR #TABS2023020047Project Closed
Project has been completed and closed
2022 Street Maintenance is a Renovation/Alteration project located at W 4th St. and N. Main St., Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $80K covering 58,000 sq ft. City of Taylor is the property owner and HDR Engineering, Inc. is the design firm of record. The project was registered with TDLR on May 25, 2023.
โFrequently Asked Questions
What is 2022 Street Maintenance?
2022 Street Maintenance is a renovation/alteration project at W 4th St. and N. Main St. in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconstruction/rehab of 2nd St., 4th Street, and Mallard Ln. including curb & gutter, curb ramps, reclamation, seal coat, reconstruction, sidewalk, pavement markings and metal beam guard fence replacement.
Is 2022 Street Maintenance open in Taylor?
Construction on 2022 Street Maintenance is complete โ TDLR records show the project passed its required accessibility inspection in May 2024. The building is finished and very likely open.
Where is 2022 Street Maintenance located?
2022 Street Maintenance is located at W 4th St. and N. Main St., Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of 2022 Street Maintenance?
City of Taylor is the property owner/developer of record for 2022 Street Maintenance, per its TDLR project registration.
Who is the architect or design firm for 2022 Street Maintenance?
HDR Engineering, Inc. is the design firm of record for 2022 Street Maintenance, according to its TDLR filing.
How much does 2022 Street Maintenance cost and how big is it?
2022 Street Maintenance has an estimated construction value of $80K and approximately 58,000 square feet (about $1/sqft), based on its TDLR filing.
๐Scope of Work
Reconstruction/rehab of 2nd St., 4th Street, and Mallard Ln. including curb & gutter, curb ramps, reclamation, seal coat, reconstruction, sidewalk, pavement markings and metal beam guard fence replacement.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 25, 2023
Review Complete
Inspection Complete
Closed
May 1, 2024