Project intelligenceTDLR TABS2026026058Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

SH 20, ETC. ( CSJ: 0001-01-075, etc.) in El Paso, TX

Various Locations, El Paso, TX, 79902

Opening ~Aug 2027Review Complete

SH 20, ETC. ( CSJ: 0001-01-075, etc.) is a renovation/alteration project at Various Locations, El Paso, in El Paso County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $3.8M across about 100 sq ft.

Estimated project value
$3.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
100 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$38.05K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 23, 2026389 days across supplied datesAug 16, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    14 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    88 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    287 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About SH 20, ETC. ( CSJ: 0001-01-075, etc.)

TxDOT District: El Paso is executing a $3,804,564 renovation and alteration project along State Highway 20 in El Paso. The filing, identified as CSJ: 0001-01-075, covers safety improvements at various locations within the 79902 ZIP code area. The scope includes installing traffic signals, pedestrian push buttons, curb ramps, and sidewalks, alongside broader intersection operational improvements. This work is registered with TDLR and involves public funds on a federally funded roadway.

Project Scope and Design

HDR Engineering, Inc. serves as the design firm of record for this infrastructure upgrade. The project is classified as a renovation and alteration, with a listed square footage of 100 sq ft. While the square footage figure is nominal, the estimated cost places this project in the top quarter of renovation and alteration filings in El Paso County. The median estimated cost for similar projects in the county is $203,814, making this SH 20 upgrade significantly larger in financial scale than the typical local alteration.

Frank Fonseca is the registered accessibility specialist associated with the filing. The project timeline reflects a substantial duration for roadwork. Construction is scheduled to start in November 2026. TDLR completed plan review in August 2026, and construction is scheduled to finish in August 2027. This scheduled build window of 287 days is longer than the county median of 120 days for similar renovation projects, accounting for the complexity of intersection operational improvements and public land coordination.

Context and Local Impact

TxDOT District: El Paso manages several other TDLR-registered projects in the region, including a $88,812,614 project in El Paso and a $1,281,294 project in Marfa. HDR Engineering, Inc. has also designed other accessibility projects across Texas, such as a $7,188,209 project in Lufkin and a $1,881,040 project in Houston. The local area, ZIP 79902, has a population of about 18,529 according to U.S. Census ACS 2023 estimates. The median household income in this area is $45,333, and housing is mostly renter-occupied. These demographic factors underscore the importance of safe pedestrian infrastructure in a community with a significant rental population.

The El Paso County unemployment rate was 4.8 percent in July 2026, higher than a year earlier. This economic context highlights the ongoing need for infrastructure investments that support both safety and local economic activity. The project’s status is Review Complete, with construction slated to begin in the fall of 2026. The integration of traffic signals and pedestrian improvements aims to enhance operational efficiency and safety for all users of the SH 20 corridor.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 79902 (El Paso)

One email per change. Unsubscribe in one click. Privacy.

SH 20, ETC. ( CSJ: 0001-01-075, etc.) is a Renovation/Alteration project located at Various Locations, El Paso, TX 79902 in El Paso, Texas. The project has an estimated value of $3.8M covering 100 sq ft. TxDOT District: El Paso is the property owner and HDR Engineering, Inc. is the design firm of record. The project was registered with TDLR on July 23, 2026.

Frequently Asked Questions

When does construction start?

Construction is scheduled to start in November 2026. TDLR completed plan review in August 2026, paving the way for the upcoming construction phase of this SH 20 safety improvement project.

Who is the design firm?

HDR Engineering, Inc. is the design firm of record for this project. They are responsible for the engineering and design aspects of the traffic signals, sidewalks, and intersection improvements.

What is the estimated cost?

The estimated cost for this project is $3,804,564. This figure is above the county median for renovation and alteration projects, placing it in the top quarter of similar filings in El Paso County.

What specific improvements are included?

The scope includes safety improvements such as traffic signals, pedestrian push buttons, curb ramps, sidewalks, and intersection operational improvements. These upgrades aim to enhance safety and accessibility along State Highway 20.

Is the project open to the public?

The project is not a business but a roadway improvement. Construction is scheduled to finish in August 2027. The TDLR status is Review Complete, indicating the design phase is finished and construction is pending.

What is SH 20, ETC. ( CSJ: 0001-01-075, etc.)?

SH 20, ETC. ( CSJ: 0001-01-075, etc.) is a renovation/alteration project at Various Locations in El Paso, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Safety improvements consisting of traffic signals, pedestrian push buttons, curb ramps, sidewalks and intersection operational improvements.

Is SH 20, ETC. ( CSJ: 0001-01-075, etc.) open in El Paso?

SH 20, ETC. ( CSJ: 0001-01-075, etc.) is still under construction in El Paso, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is SH 20, ETC. ( CSJ: 0001-01-075, etc.) located?

SH 20, ETC. ( CSJ: 0001-01-075, etc.) is located at Various Locations, El Paso, TX, 79902, in El Paso County.

Who is the owner or developer of SH 20, ETC. ( CSJ: 0001-01-075, etc.)?

TxDOT District: El Paso is the property owner/developer of record for SH 20, ETC. ( CSJ: 0001-01-075, etc.), per its TDLR project registration.

Who is the architect or design firm for SH 20, ETC. ( CSJ: 0001-01-075, etc.)?

HDR Engineering, Inc. is the design firm of record for SH 20, ETC. ( CSJ: 0001-01-075, etc.), according to its TDLR filing.

How much does SH 20, ETC. ( CSJ: 0001-01-075, etc.) cost and how big is it?

SH 20, ETC. ( CSJ: 0001-01-075, etc.) has an estimated construction value of $3.8M and approximately 100 square feet (about $38.05K/sqft), based on its TDLR filing.

Scope of Work

Safety improvements consisting of traffic signals, pedestrian push buttons, curb ramps, sidewalks and intersection operational improvements.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various Locations, El Paso, TX, 79902

Loading location map…
31.79379, -106.49360

Watch all construction in 79902 (El Paso)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.