2019 TPWD Park Improvements
NW corner of School Ave and Holly Street, Waskom, TX, 75692
2019 TPWD Park Improvements is a new construction project at NW corner of School Ave and Holly Street, Waskom, in Harrison County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $132K across about 10,000 sq ft.
- Estimated project value
- $132K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $13/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
21 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
119 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75692 (Waskom)
One email per change. Unsubscribe in one click. Privacy.
2019 TPWD Park Improvements is a New Construction project located at NW corner of School Ave and Holly Street, Waskom, TX 75692 in Waskom, Texas. The project has an estimated value of $132K covering 10,000 sq ft. City of Waskom is the property owner and Stephens Engineering is the design firm of record. The project was registered with TDLR on January 13, 2020.
Frequently Asked Questions
What is 2019 TPWD Park Improvements?
2019 TPWD Park Improvements is a new construction project at NW corner of School Ave and Holly Street in Waskom, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Splash pad with shades, sidewalk, and other appurtenances.
Is 2019 TPWD Park Improvements open in Waskom?
2019 TPWD Park Improvements was scheduled to finish construction in Jun 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is 2019 TPWD Park Improvements located?
2019 TPWD Park Improvements is located at NW corner of School Ave and Holly Street, Waskom, TX, 75692, in Harrison County.
Who is the owner or developer of 2019 TPWD Park Improvements?
City of Waskom is the property owner/developer of record for 2019 TPWD Park Improvements, per its TDLR project registration.
Who is the architect or design firm for 2019 TPWD Park Improvements?
Stephens Engineering is the design firm of record for 2019 TPWD Park Improvements, according to its TDLR filing.
How much does 2019 TPWD Park Improvements cost and how big is it?
2019 TPWD Park Improvements has an estimated construction value of $132K and approximately 10,000 square feet (about $13/sqft), based on its TDLR filing.
Scope of Work
Splash pad with shades, sidewalk, and other appurtenances.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
NW corner of School Ave and Holly Street, Waskom, TX, 75692
Related Projects
Watch all construction in 75692 (Waskom)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Waskom?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.