Waskom, TX Construction Projects

What's being built in Waskom11 projects on file from Texas public records

11
Total Projects
$49.2M
Total Investment
9
New Construction
2
Renovations
115K
Total Sq Ft
$4.5M
Avg. Value

What is being built in Waskom, Texas?

Waskom, Texas has 11 construction and development projects on file worth $49.2M — 9 new construction and 2 renovations or remodels. Each record is a real filing from Texas public construction records and names the project, its declared value and the date it was registered.

What new businesses are coming to Waskom?

The most recently filed new-construction projects in Waskom are City of Waskom City Library ($439K), 2024 Bond Program EFISD - Field House & Elementary ($35.9M), Allsup's Waskom (SWC 134) ($2.5M), Waskom, TX Family Dollar Tree ($500K). A new-construction filing is the earliest public signal that something new is being built, usually well before it opens, so this list leads street-level visibility rather than following it.

Harrison County Economy

Driving Waskom construction · FRED

Unemployment:5.2%
Zabalist / visual intelligence

See the shape of development

Compare project scale, registration dates, and locations across 11 loaded TDLR filings. This is the loaded selection, not a measure of every project in the market.

Waskom
Estimated construction value$49.2MSum of 11 shown records with value
Records in view11 / 11Ready to inspect and compare
Largest record’s share72.9%Share of reported value shown
01

Where the value sits

Area = reported value
Select a block to inspect0 without reported value
Waskom

Comparisons use only these 11 records. Missing values are excluded from totals. Recorded value is not revenue or a quality rating.

Construction & Development in Waskom, Texas

Waskom is experiencing significant construction and development activity with 11 registered projects valued at $49.2M. The city's development portfolio includes 9 new construction projects and 2 renovation projects, representing 114,529 square feet of built space across commercial, residential, and mixed-use developments.

Development Activity

  • 9 new construction projects (82%)
  • 2 renovation/remodel projects (18%)
  • Average project value: $4.5M

Key Players

Waskom's construction market features 4 major property owners and 5 active design firms driving development across the city.

Leading developers include City of Waskom and WASKOM ISD, working with architecture firms such as CLARK AGGEN ARCHITECT and Stephens Engineering.

Our database tracks all TDLR-registered construction projects in Waskom. Projects span Harrison counties, providing comprehensive coverage of commercial construction, residential development, and infrastructure improvements throughout Waskom and the surrounding area.

All Projects

11 TDLR · 0 Site Plans

Showing 11 of 11 listed TDLR filings

Inspection Complete
$3.5M

WASKOM FIELD HOUSE

365 WEST SCHOOL AVE, Waskom, TX 75692

Jun 10, 2016

Waskom construction questions

How many construction projects are there in Waskom, Texas?
There are 11 registered construction projects in Waskom, Texas with a total estimated value of $49.2M and 114,529 square feet of development. The average project is valued at $4.5M.
What kind of construction is happening in Waskom?
Waskom has 9 new construction projects (82%) and 2 renovation or remodel projects (18%) on file, together totaling 114,529 square feet. Work spans commercial, residential and mixed-use development.
Who is building in Waskom?
The most active property owners on file in Waskom are City of Waskom, WASKOM ISD, Elysian Fields Independent School District. The architecture and design firms appearing most often on Waskom filings are CLARK AGGEN ARCHITECT, Stephens Engineering, Harris Craig Architects, Inc..
Where does this Waskom construction data come from?
Every project on this page is a TDLR-registered construction filing from Texas public records, not an estimate or a listing. Each entry keeps the project name, declared value, owner and registration date exactly as filed, which is why a project can appear here months before any visible work starts on site.

Figures on this page are counted from the Waskom filings themselves and change as new records are registered. How Zabalist sources Texas construction records.