Project has been completed and closed
RRMC ICU & Bed Depot Expansion is a Additions to Existing Building project located at 2400 Round Rock Avenue, Round Rock, TX 78681 in Round Rock, Texas. The project has an estimated value of $1.5M covering 3,813 sq ft. St. David's Healthcare is the property owner and BSA LifeStructures is the design firm of record. The project was registered with TDLR on February 17, 2020.
Renovation and expansion of 3,813 sf of the first floor of existing Hospital. Addition of 1,600 sf of new construction & renovation of 3,712 of existing level 2
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Filed
Feb 17, 2020
Review Complete
Inspection Complete
Closed
Mar 1, 2021
Building permits found at or near this location
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
Update 6/1/26 LS- 2 phase project. Both bathrooms are being remodel. GC will complete primary bathroom and then call in inspections for second guest bathroom. Interior remodel Remodel Primary Bathroom -Move plumbing for shower toilet and vanities. Move Existing Partition walls between Primary Bathroom and Bedroom Approximately 4 ft. Add to Primary Partition Closet Wall to the new depth of Primary Bathroom. Electrical will be reconfigured with New Walls. Secondary Bathroom - Remove Existing shower and install tub shower in its place. Remove and install new plumbing valves and fixtures in same location
We want to install a Battery at this residence. We will be installing downstream of main service disconnect.
1. Run 28 of 1.25 black Iron pipe mounted to generator 2. Replace tank-style water heater in garage with 199000 BTU condensing tankless water heater