US 180 and SH 137
US 180 and SH 137 is a new construction project at US 180 and SH 137, Lamesa, in Dawson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Feb 2024). The project has an estimated value of $21.4M across about 92,948 sq ft.
๐Project Metrics
TDLR #TABS2020012648Project Closed
Project has been completed and closed
US 180 and SH 137 is a New Construction project located at US 180 and SH 137, Lamesa, TX 79331 in Lamesa, Texas. The project has an estimated value of $21.4M covering 92,948 sq ft. TxDOT District: Lubbock is the property owner. The project was registered with TDLR on February 28, 2020.
โFrequently Asked Questions
What is US 180 and SH 137?
US 180 and SH 137 is a new construction project at US 180 and SH 137 in Lamesa, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehab, concrete paving, hot mix, sidewalk, ramps, driveways, structures, traffic signals, lighting, signing, striping
Is US 180 and SH 137 open in Lamesa?
Construction on US 180 and SH 137 is complete โ TDLR records show the project passed its required accessibility inspection in Feb 2024. The building is finished and very likely open.
Where is US 180 and SH 137 located?
US 180 and SH 137 is located at US 180 and SH 137, Lamesa, TX, 79331, in Dawson County.
Who is the owner or developer of US 180 and SH 137?
TxDOT District: Lubbock is the property owner/developer of record for US 180 and SH 137, per its TDLR project registration.
How much does US 180 and SH 137 cost and how big is it?
US 180 and SH 137 has an estimated construction value of $21.4M and approximately 92,948 square feet (about $231/sqft), based on its TDLR filing.
๐Scope of Work
Rehab, concrete paving, hot mix, sidewalk, ramps, driveways, structures, traffic signals, lighting, signing, striping
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Feb 28, 2020
Review Complete
Inspection Complete
Closed
Feb 29, 2024
Property Owner
Registered Accessibility Specialist
Explore Area
Find Professionals