Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Boswell High School Additions and Renovations
5805 W. Bailey Boswell Road, Fort Worth, TX, 76179
Boswell High School Additions and Renovations is a renovation/alteration project at 5805 W. Bailey Boswell Road, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2020). The project has an estimated value of $5.0M across about 12,999 sq ft.
- Estimated project value
- $5.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 12,999 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $385/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
2 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
153 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76179 (Fort Worth)
One email per change. Unsubscribe in one click. Privacy.
Boswell High School Additions and Renovations is a Renovation/Alteration project located at 5805 W. Bailey Boswell Road, Fort Worth, TX 76179 in Fort Worth, Texas. The project has an estimated value of $5.0M covering 12,999 sq ft. Eagle Mountain-Saginaw Independent School District is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on March 30, 2020.
Frequently Asked Questions
What is Boswell High School Additions and Renovations?
Boswell High School Additions and Renovations is a renovation/alteration project at 5805 W. Bailey Boswell Road in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Site utility, paving, and renovation to existing turf building
Is Boswell High School Additions and Renovations open in Fort Worth?
Construction on Boswell High School Additions and Renovations is complete — TDLR records show the project passed its required accessibility inspection in Sep 2020. The building is finished and very likely open.
Where is Boswell High School Additions and Renovations located?
Boswell High School Additions and Renovations is located at 5805 W. Bailey Boswell Road, Fort Worth, TX, 76179, in Tarrant County.
Who is the owner or developer of Boswell High School Additions and Renovations?
Eagle Mountain-Saginaw Independent School District is the property owner/developer of record for Boswell High School Additions and Renovations, per its TDLR project registration.
Who is the architect or design firm for Boswell High School Additions and Renovations?
VLK Architects Inc is the design firm of record for Boswell High School Additions and Renovations, according to its TDLR filing.
How much does Boswell High School Additions and Renovations cost and how big is it?
Boswell High School Additions and Renovations has an estimated construction value of $5.0M and approximately 12,999 square feet (about $385/sqft), based on its TDLR filing.
Scope of Work
Site utility, paving, and renovation to existing turf building
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Related Projects
Same Owner
$498.1M totalSame Design Firm
$9.52B totalRelated City Permits
Building permits found at or near this location
Roof replacement of areas indicated on plans indicated on plans to be completed in summer 2025. Also, areas of roof top unit replacement as indicated on plans with associated piping, electrical, and ceiling work to be completed in summer 2025.
Watch all construction in 76179 (Fort Worth)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.