LEVEL 15 FINISH OUT at DOM10
LEVEL 15 FINISH OUT at DOM10 is a renovation/alteration project at 11815 Alterra Parkway, Level 15, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2021). The project has an estimated value of $4.3M across about 33,488 sq ft.
๐Project Metrics
TDLR #TABS2020015153Project Closed
Project has been completed and closed
LEVEL 15 FINISH OUT at DOM10 is a Renovation/Alteration project located at 11815 Alterra Parkway, Level 15, Austin, TX 78758 in Austin, Texas. The project has an estimated value of $4.3M covering 33,488 sq ft. Cousins Properties is the property owner and Cushing Terrell is the design firm of record. The project was registered with TDLR on April 7, 2020.
โFrequently Asked Questions
What is LEVEL 15 FINISH OUT at DOM10?
LEVEL 15 FINISH OUT at DOM10 is a renovation/alteration project at 11815 Alterra Parkway, Level 15 in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior tenant finish out to create adm/bus/prof office.
Is LEVEL 15 FINISH OUT at DOM10 open in Austin?
Construction on LEVEL 15 FINISH OUT at DOM10 is complete โ TDLR records show the project passed its required accessibility inspection in Jun 2021. The building is finished and very likely open.
Where is LEVEL 15 FINISH OUT at DOM10 located?
LEVEL 15 FINISH OUT at DOM10 is located at 11815 Alterra Parkway, Level 15, Austin, TX, 78758, in Travis County.
Who is the owner or developer of LEVEL 15 FINISH OUT at DOM10?
Cousins Properties is the property owner/developer of record for LEVEL 15 FINISH OUT at DOM10, per its TDLR project registration.
Who is the architect or design firm for LEVEL 15 FINISH OUT at DOM10?
Cushing Terrell is the design firm of record for LEVEL 15 FINISH OUT at DOM10, according to its TDLR filing.
How much does LEVEL 15 FINISH OUT at DOM10 cost and how big is it?
LEVEL 15 FINISH OUT at DOM10 has an estimated construction value of $4.3M and approximately 33,488 square feet (about $128/sqft), based on its TDLR filing.
๐Scope of Work
Interior tenant finish out to create adm/bus/prof office.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 7, 2020
Review Complete
Inspection Complete
Closed
Jun 1, 2021
๐Related Projects
๐คSame Owner
$581.2M total๐Related City Permits
Building permits found at or near this location
New meter and new breaker panel
Interior remodel existing admin office break area to create accessory use small restaurant (coffee shop) for employees only.
Interior remodel existing admin office break area to create accessory use small restaurant (coffee shop) for employees only.
Express- Foundation repair on a slab foundation. Install 18 total press piling piers along the perimeter. There will be 1 breakthrough and patched location. We will improve level to the extent.
Interior remodel existing admin office break area to create accessory use small restaurant (coffee shop) for employees only.