VAndegrift High School Classroom Incubator Renovation
VAndegrift High School Classroom Incubator Renovation is a renovation/alteration project at 9500 McNeil Drive, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $174K across about 2,495 sq ft.
๐Project Metrics
TDLR #TABS2020015288Project Closed
Project has been completed and closed
VAndegrift High School Classroom Incubator Renovation is a Renovation/Alteration project located at 9500 McNeil Drive, Austin, TX 78750 in Austin, Texas. The project has an estimated value of $174K covering 2,495 sq ft. Leander ISD is the property owner and Fields & Associates Architects is the design firm of record. The project was registered with TDLR on April 8, 2020.
โFrequently Asked Questions
What is VAndegrift High School Classroom Incubator Renovation?
VAndegrift High School Classroom Incubator Renovation is a renovation/alteration project at 9500 McNeil Drive in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Remodel existing classroom into Incubator Classroom
Is VAndegrift High School Classroom Incubator Renovation open in Austin?
Construction on VAndegrift High School Classroom Incubator Renovation is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.
Where is VAndegrift High School Classroom Incubator Renovation located?
VAndegrift High School Classroom Incubator Renovation is located at 9500 McNeil Drive, Austin, TX, 78750, in Travis County.
Who is the owner or developer of VAndegrift High School Classroom Incubator Renovation?
Leander ISD is the property owner/developer of record for VAndegrift High School Classroom Incubator Renovation, per its TDLR project registration.
Who is the architect or design firm for VAndegrift High School Classroom Incubator Renovation?
Fields & Associates Architects is the design firm of record for VAndegrift High School Classroom Incubator Renovation, according to its TDLR filing.
How much does VAndegrift High School Classroom Incubator Renovation cost and how big is it?
VAndegrift High School Classroom Incubator Renovation has an estimated construction value of $174K and approximately 2,495 square feet (about $70/sqft), based on its TDLR filing.
๐Scope of Work
Remodel existing classroom into Incubator Classroom
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Apr 8, 2020
Review Complete
Inspection Complete
Closed
Aug 1, 2020
๐Related Projects
๐คSame Owner
$596.3M total๐Related City Permits
Building permits found at or near this location
Install Sprinkler System
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1411
Dawson S351 C Left New - 1 Story SFR w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio required parking: 2
add outside spigot
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system without duct work for Unit 1212