Project intelligenceTDLR TABS2020015670New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

US 79 Traffic Signal Improvements in Rockdale, TX

Various, Rockdale, TX, 77803

Target date passed (Feb 2023)Review Complete

US 79 Traffic Signal Improvements is a new construction project at Various, Rockdale, in Brazos County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Feb 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.3M across about 1 sq ft.

Estimated project value
$1.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1276.22K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 15, 20201,049 days across supplied datesFeb 28, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    229 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    820 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77803 (Rockdale)

One email per change. Unsubscribe in one click. Privacy.

US 79 Traffic Signal Improvements is a New Construction project located at Various, Rockdale, TX 77803 in Rockdale, Texas. The project has an estimated value of $1.3M covering 1 sq ft. TxDOT District: Bryan is the property owner. The project was registered with TDLR on April 15, 2020.

Frequently Asked Questions

What is US 79 Traffic Signal Improvements?

US 79 Traffic Signal Improvements is a new construction project at Various in Rockdale, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Improvements to signals that include upgraded pedestrian detection, signal heads, and ramps.

Is US 79 Traffic Signal Improvements open in Rockdale?

US 79 Traffic Signal Improvements was scheduled to finish construction in Feb 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is US 79 Traffic Signal Improvements located?

US 79 Traffic Signal Improvements is located at Various, Rockdale, TX, 77803, in Brazos County.

Who is the owner or developer of US 79 Traffic Signal Improvements?

TxDOT District: Bryan is the property owner/developer of record for US 79 Traffic Signal Improvements, per its TDLR project registration.

How much does US 79 Traffic Signal Improvements cost and how big is it?

US 79 Traffic Signal Improvements has an estimated construction value of $1.3M and approximately 1 square feet (about $1276.22K/sqft), based on its TDLR filing.

Scope of Work

Improvements to signals that include upgraded pedestrian detection, signal heads, and ramps.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Various, Rockdale, TX, 77803

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77803 (Rockdale)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rockdale?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.