University of Texas at Tyler Sidewalk Improvements Phase 3A

3900 University Boulevard, Tyler, TX, 75799

Target date passed (Oct 2020)Review Complete

University of Texas at Tyler Sidewalk Improvements Phase 3A is a new construction project at 3900 University Boulevard, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $1.5M across about 165,528 sq ft.

Estimated project value
$1.5M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
165,528 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$9/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 29, 2020155 days across supplied datesOct 31, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75799 (Tyler)

One email per change. Unsubscribe in one click. Privacy.

University of Texas at Tyler Sidewalk Improvements Phase 3A is a New Construction project located at 3900 University Boulevard, Tyler, TX 75799 in Tyler, Texas. The project has an estimated value of $1.5M covering 165,528 sq ft. University of Texas at Tyler is the property owner and Pacheco Koch Consulting Engineers Inc. is the design firm of record. The project was registered with TDLR on May 29, 2020.

Frequently Asked Questions

What is University of Texas at Tyler Sidewalk Improvements Phase 3A?

University of Texas at Tyler Sidewalk Improvements Phase 3A is a new construction project at 3900 University Boulevard in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New parking lot and sidewalk to serve the University

Is University of Texas at Tyler Sidewalk Improvements Phase 3A open in Tyler?

University of Texas at Tyler Sidewalk Improvements Phase 3A was scheduled to finish construction in Oct 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is University of Texas at Tyler Sidewalk Improvements Phase 3A located?

University of Texas at Tyler Sidewalk Improvements Phase 3A is located at 3900 University Boulevard, Tyler, TX, 75799, in Smith County.

Who is the owner or developer of University of Texas at Tyler Sidewalk Improvements Phase 3A?

University of Texas at Tyler is the property owner/developer of record for University of Texas at Tyler Sidewalk Improvements Phase 3A, per its TDLR project registration.

Who is the architect or design firm for University of Texas at Tyler Sidewalk Improvements Phase 3A?

Pacheco Koch Consulting Engineers Inc. is the design firm of record for University of Texas at Tyler Sidewalk Improvements Phase 3A, according to its TDLR filing.

How much does University of Texas at Tyler Sidewalk Improvements Phase 3A cost and how big is it?

University of Texas at Tyler Sidewalk Improvements Phase 3A has an estimated construction value of $1.5M and approximately 165,528 square feet (about $9/sqft), based on its TDLR filing.

Scope of Work

New parking lot and sidewalk to serve the University

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3900 University Boulevard, Tyler, TX, 75799

Location by street address

Watch all construction in 75799 (Tyler)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.