Project intelligenceTDLR TABS2020020658New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

University of Texas at Tyler Sidewalk Improvements Phase 3B

3900 University Boulevard, Tyler, TX, 75799

Target date passed (Oct 2020)Review Complete

University of Texas at Tyler Sidewalk Improvements Phase 3B is a new construction project at 3900 University Boulevard, Tyler, in Smith County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2020 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $646K across about 22,000 sq ft.

Estimated project value
$646K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
22,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$29/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 16, 202096 days across supplied datesOct 20, 2020

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    35 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    61 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75799 (Tyler)

One email per change. Unsubscribe in one click. Privacy.

University of Texas at Tyler Sidewalk Improvements Phase 3B is a New Construction project located at 3900 University Boulevard, Tyler, TX 75799 in Tyler, Texas. The project has an estimated value of $646K covering 22,000 sq ft. University of Texas at Tyler is the property owner and Pacheco Koch Consulting Engineers, Inc. is the design firm of record. The project was registered with TDLR on July 16, 2020.

Frequently Asked Questions

What is University of Texas at Tyler Sidewalk Improvements Phase 3B?

University of Texas at Tyler Sidewalk Improvements Phase 3B is a new construction project at 3900 University Boulevard in Tyler, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New sidewalk from new parking lot. Sidewalk will continue south towards University Blvd., continue along University Blvd, to the apartment complex, Victory Village near Adam Henry Rd.

Is University of Texas at Tyler Sidewalk Improvements Phase 3B open in Tyler?

University of Texas at Tyler Sidewalk Improvements Phase 3B was scheduled to finish construction in Oct 2020 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is University of Texas at Tyler Sidewalk Improvements Phase 3B located?

University of Texas at Tyler Sidewalk Improvements Phase 3B is located at 3900 University Boulevard, Tyler, TX, 75799, in Smith County.

Who is the owner or developer of University of Texas at Tyler Sidewalk Improvements Phase 3B?

University of Texas at Tyler is the property owner/developer of record for University of Texas at Tyler Sidewalk Improvements Phase 3B, per its TDLR project registration.

Who is the architect or design firm for University of Texas at Tyler Sidewalk Improvements Phase 3B?

Pacheco Koch Consulting Engineers, Inc. is the design firm of record for University of Texas at Tyler Sidewalk Improvements Phase 3B, according to its TDLR filing.

How much does University of Texas at Tyler Sidewalk Improvements Phase 3B cost and how big is it?

University of Texas at Tyler Sidewalk Improvements Phase 3B has an estimated construction value of $646K and approximately 22,000 square feet (about $29/sqft), based on its TDLR filing.

Scope of Work

New sidewalk from new parking lot. Sidewalk will continue south towards University Blvd., continue along University Blvd, to the apartment complex, Victory Village near Adam Henry Rd.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3900 University Boulevard, Tyler, TX, 75799

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 75799 (Tyler)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.