Project intelligenceTDLR TABS2022003454Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Complete Streets Phase I

Intersection of Broad St and Cedar St, Cedar Hill, TX, 75104

Construction complete · Aug 2022Project Closed

Complete Streets Phase I is a renovation/alteration project at Intersection of Broad St and Cedar St, Cedar Hill, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $300K across about 14,000 sq ft.

Estimated project value
$300K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
14,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$21/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 19, 2021316 days across supplied datesAug 31, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    74 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    242 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75104 (Cedar Hill)

One email per change. Unsubscribe in one click. Privacy.

Complete Streets Phase I is a Renovation/Alteration project located at Intersection of Broad St and Cedar St, Cedar Hill, TX 75104 in Cedar Hill, Texas. The project has an estimated value of $300K covering 14,000 sq ft. City of Cedar Hill is the property owner and Pacheco Koch Consulting Engineers, Inc. is the design firm of record. The project was registered with TDLR on October 19, 2021.

Frequently Asked Questions

What is Complete Streets Phase I?

Complete Streets Phase I is a renovation/alteration project at Intersection of Broad St and Cedar St in Cedar Hill, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The project is a complete street reconstruction of Broad Street from Belt Line Road to Cedar Street and Cedar Street from Broad Street to the BNSF railroad ROW in downtown Cedar Hill.

Is Complete Streets Phase I open in Cedar Hill?

Construction on Complete Streets Phase I is complete — TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.

Where is Complete Streets Phase I located?

Complete Streets Phase I is located at Intersection of Broad St and Cedar St, Cedar Hill, TX, 75104, in Dallas County.

Who is the owner or developer of Complete Streets Phase I?

City of Cedar Hill is the property owner/developer of record for Complete Streets Phase I, per its TDLR project registration.

Who is the architect or design firm for Complete Streets Phase I?

Pacheco Koch Consulting Engineers, Inc. is the design firm of record for Complete Streets Phase I, according to its TDLR filing.

How much does Complete Streets Phase I cost and how big is it?

Complete Streets Phase I has an estimated construction value of $300K and approximately 14,000 square feet (about $21/sqft), based on its TDLR filing.

Scope of Work

The project is a complete street reconstruction of Broad Street from Belt Line Road to Cedar Street and Cedar Street from Broad Street to the BNSF railroad ROW in downtown Cedar Hill.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Intersection of Broad St and Cedar St, Cedar Hill, TX, 75104

Location by street address

Watch all construction in 75104 (Cedar Hill)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Cedar Hill?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.