Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Citywide Park Improvements
218 REMINGTON TRL, Longview, TX, 75608
Citywide Park Improvements is a renovation/alteration project at 218 REMINGTON TRL, Longview, in Gregg County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2021). The project has an estimated value of $4.0M across about 5,800 sq ft.
- Estimated project value
- $4.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,800 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $690/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
77 days after the preceding date shown.
Source: TDLR filing
View source recordInspection complete · TDLR filing
The filing records completion of the accessibility inspection.
430 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Inspection Complete
Final inspection completed, awaiting project closure
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 75608 (Longview)
One email per change. Unsubscribe in one click. Privacy.
Citywide Park Improvements is a Renovation/Alteration project located at 218 REMINGTON TRL, Longview, TX 75608 in Longview, Texas. The project has an estimated value of $4.0M covering 5,800 sq ft. City of Longview is the property owner and JCR Engineers, LLC is the design firm of record. The project was registered with TDLR on June 9, 2020.
Frequently Asked Questions
What is Citywide Park Improvements?
Citywide Park Improvements is a renovation/alteration project at 218 REMINGTON TRL in Longview, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of existing pavilions, addition of new pavilions, sidewalks, parking area improvements, playground equipment replacement, ball field light replacement, basketball court surface repair, volleyball court, youth football fields,…
Is Citywide Park Improvements open in Longview?
Construction on Citywide Park Improvements is complete — TDLR records show the project passed its required accessibility inspection in Oct 2021. The building is finished and very likely open.
Where is Citywide Park Improvements located?
Citywide Park Improvements is located at 218 REMINGTON TRL, Longview, TX, 75608, in Gregg County.
Who is the owner or developer of Citywide Park Improvements?
City of Longview is the property owner/developer of record for Citywide Park Improvements, per its TDLR project registration.
Who is the architect or design firm for Citywide Park Improvements?
JCR Engineers, LLC is the design firm of record for Citywide Park Improvements, according to its TDLR filing.
How much does Citywide Park Improvements cost and how big is it?
Citywide Park Improvements has an estimated construction value of $4.0M and approximately 5,800 square feet (about $690/sqft), based on its TDLR filing.
Scope of Work
Replacement of existing pavilions, addition of new pavilions, sidewalks, parking area improvements, playground equipment replacement, ball field light replacement, basketball court surface repair, volleyball court, youth football fields, prefabricate
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
218 REMINGTON TRL, Longview, TX, 75608
Related Projects
Same Owner
$592.9M totalSame Design Firm
$6.2M totalWatch all construction in 75608 (Longview)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Longview?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.