Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Park Crest Middle School Locker Room Renovation
1500 N. Railroad Ave., Pflugerville, TX, 78660
Park Crest Middle School Locker Room Renovation is a renovation/alteration project at 1500 N. Railroad Ave., Pflugerville, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2020). The project has an estimated value of $147K across about 4,993 sq ft.
- Estimated project value
- $147K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 4,993 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $30/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
21 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
36 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78660 (Pflugerville)
One email per change. Unsubscribe in one click. Privacy.
Park Crest Middle School Locker Room Renovation is a Renovation/Alteration project located at 1500 N. Railroad Ave., Pflugerville, TX 78660 in Pflugerville, Texas. The project has an estimated value of $147K covering 4,993 sq ft. Pflugerville ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on June 29, 2020.
Frequently Asked Questions
What is Park Crest Middle School Locker Room Renovation?
Park Crest Middle School Locker Room Renovation is a renovation/alteration project at 1500 N. Railroad Ave. in Pflugerville, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: The work includes locker repair/replacements, interior refinish including repainting walls and ceilings and resurfacing locker room floors.
Is Park Crest Middle School Locker Room Renovation open in Pflugerville?
Construction on Park Crest Middle School Locker Room Renovation is complete — TDLR records show the project passed its required accessibility inspection in Aug 2020. The building is finished and very likely open.
Where is Park Crest Middle School Locker Room Renovation located?
Park Crest Middle School Locker Room Renovation is located at 1500 N. Railroad Ave., Pflugerville, TX, 78660, in Travis County.
Who is the owner or developer of Park Crest Middle School Locker Room Renovation?
Pflugerville ISD is the property owner/developer of record for Park Crest Middle School Locker Room Renovation, per its TDLR project registration.
Who is the architect or design firm for Park Crest Middle School Locker Room Renovation?
Pfluger Architects is the design firm of record for Park Crest Middle School Locker Room Renovation, according to its TDLR filing.
How much does Park Crest Middle School Locker Room Renovation cost and how big is it?
Park Crest Middle School Locker Room Renovation has an estimated construction value of $147K and approximately 4,993 square feet (about $30/sqft), based on its TDLR filing.
Scope of Work
The work includes locker repair/replacements, interior refinish including repainting walls and ceilings and resurfacing locker room floors.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1500 N. Railroad Ave., Pflugerville, TX, 78660
Related Projects
Same Owner
$236.2M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
ePlan: Commercial Expedited Review - Addition and Change of Use from Transportation Terminal to Restaurant (2131 SF).
ePlan: Residential Expedited Review - New Construction of 2-Story SF Res [4bed 4.5bath] with attached garage and patio.
Remodel of one corner of the space to add three new dental chairs. (Floor 1)
Replacement of complete existing central heat and air system with or without duct work
Watch all construction in 78660 (Pflugerville)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Pflugerville?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.