Project intelligenceTDLR TABS2020022265New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Rio Medina Fire Station No. 15

135 Stone Loop, Rio Medina, TX, 78079

Construction complete · Dec 2021Project Closed

Rio Medina Fire Station No. 15 is a new construction project at 135 Stone Loop, Rio Medina, in Medina County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $2.8M across about 11,000 sq ft.

Estimated project value
$2.8M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
11,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$255/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Aug 14, 2020504 days across supplied datesDec 31, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    456 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78079 (Rio Medina)

One email per change. Unsubscribe in one click. Privacy.

Rio Medina Fire Station No. 15 is a New Construction project located at 135 Stone Loop, Rio Medina, TX 78079 in Rio Medina, Texas. The project has an estimated value of $2.8M covering 11,000 sq ft. Medina County ESD #1 is the property owner and Debra J. Dockery, Architect, P.C. is the design firm of record. The project was registered with TDLR on August 14, 2020.

Frequently Asked Questions

What is Rio Medina Fire Station No. 15?

Rio Medina Fire Station No. 15 is a new construction project at 135 Stone Loop in Rio Medina, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 11,000 square foot fire station.

Is Rio Medina Fire Station No. 15 open in Rio Medina?

Construction on Rio Medina Fire Station No. 15 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is Rio Medina Fire Station No. 15 located?

Rio Medina Fire Station No. 15 is located at 135 Stone Loop, Rio Medina, TX, 78079, in Medina County.

Who is the owner or developer of Rio Medina Fire Station No. 15?

Medina County ESD #1 is the property owner/developer of record for Rio Medina Fire Station No. 15, per its TDLR project registration.

Who is the architect or design firm for Rio Medina Fire Station No. 15?

Debra J. Dockery, Architect, P.C. is the design firm of record for Rio Medina Fire Station No. 15, according to its TDLR filing.

How much does Rio Medina Fire Station No. 15 cost and how big is it?

Rio Medina Fire Station No. 15 has an estimated construction value of $2.8M and approximately 11,000 square feet (about $255/sqft), based on its TDLR filing.

Scope of Work

New 11,000 square foot fire station.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

135 Stone Loop, Rio Medina, TX, 78079

29.43148, -98.85557

Watch all construction in 78079 (Rio Medina)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Rio Medina?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.