Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Kingwood High School Floodproofing Project
2701 Kingwood Dr., Kingwood, TX, 77339
Kingwood High School Floodproofing Project is a renovation/alteration project at 2701 Kingwood Dr., Kingwood, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2023). The project has an estimated value of $20.0M across about 11,000 sq ft.
- Estimated project value
- $20.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 11,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.82K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 11mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
77 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
1,062 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77339 (Kingwood)
One email per change. Unsubscribe in one click. Privacy.
Kingwood High School Floodproofing Project is a Renovation/Alteration project located at 2701 Kingwood Dr., Kingwood, TX 77339 in Kingwood, Texas. The project has an estimated value of $20.0M covering 11,000 sq ft. Humble Independent School District is the property owner and PBK is the design firm of record. The project was registered with TDLR on August 17, 2020.
Frequently Asked Questions
What is Kingwood High School Floodproofing Project?
Kingwood High School Floodproofing Project is a renovation/alteration project at 2701 Kingwood Dr. in Kingwood, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Adding a perimeter Concrete Retention wall around the Building for flood proofing measures, also adding float up gates at entries.
Is Kingwood High School Floodproofing Project open in Kingwood?
Construction on Kingwood High School Floodproofing Project is complete — TDLR records show the project passed its required accessibility inspection in Sep 2023. The building is finished and very likely open.
Where is Kingwood High School Floodproofing Project located?
Kingwood High School Floodproofing Project is located at 2701 Kingwood Dr., Kingwood, TX, 77339, in Harris County.
Who is the owner or developer of Kingwood High School Floodproofing Project?
Humble Independent School District is the property owner/developer of record for Kingwood High School Floodproofing Project, per its TDLR project registration.
Who is the architect or design firm for Kingwood High School Floodproofing Project?
PBK is the design firm of record for Kingwood High School Floodproofing Project, according to its TDLR filing.
How much does Kingwood High School Floodproofing Project cost and how big is it?
Kingwood High School Floodproofing Project has an estimated construction value of $20.0M and approximately 11,000 square feet (about $1.82K/sqft), based on its TDLR filing.
Scope of Work
Adding a perimeter Concrete Retention wall around the Building for flood proofing measures, also adding float up gates at entries.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2701 Kingwood Dr., Kingwood, TX, 77339
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$594.0M totalWatch all construction in 77339 (Kingwood)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Kingwood?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.