Project intelligenceTDLR TABS2025008980New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Ross Sterling Middle School Replacement in Humble, TX

Rustic Timbers Dr., Humble, TX, 77338

Opening ~Aug 2027Review Complete

Ross Sterling Middle School Replacement is a new construction project at Rustic Timbers Dr., Humble, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Aug 2027. The project has an estimated value of $74.3M across about 213,734 sq ft.

Estimated project value
$74.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
213,734 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$348/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 2mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jan 7, 2025944 days across supplied datesAug 9, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    150 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    794 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About Ross Sterling Middle School Replacement

Ross Sterling Middle School Replacement is a new three-story facility rising on Rustic Timbers Dr. in Humble, Texas. The 213,734-square-foot structure represents a significant public investment, with an estimated cost of $74,302,171. This project is a replacement campus for the Humble Independent School District, designed to serve the local community with modern educational infrastructure.

Construction is scheduled to finish in August 2027, with work starting in June 2025. TDLR completed plan review in January 2025, marking the project as Review Complete. The build window spans approximately 794 days, a duration longer than the 219-day median for new construction filings in Harris County. The site itself covers 30.4472 acres, providing ample space for the building and associated outdoor features.

The scope of work includes all site paving, practice fields, and play fields. This comprehensive approach ensures the campus is fully functional upon completion. The design is credited to Kirksey Architecture, a firm with a portfolio that includes other significant projects in the Houston area. The project utilizes public funds and is located on public land, reflecting a commitment to community infrastructure development.

The estimated cost of $348 per square foot is above the county median of $88 for similar new construction filings. This figure reflects the complexity of a three-story middle school with extensive site work. Humble Independent School District has registered six other projects with TDLR, totaling $59,532,178, indicating a broader pattern of facility investment in the district. The Ross Sterling project stands out as the largest single investment in this group.

Local coverage, including a report by S&P, noted the groundbreaking event for the Ross Sterling Middle School Replacement. Community Impact also reported on the gathering of Humble ISD officials and trustees for the ceremony. These external references align with the TDLR record, which confirms the project's status and timeline. The project is registered with TDLR, ensuring compliance with accessibility standards throughout the construction process.

The surrounding area includes various businesses and institutions, such as George Turner Stadium and Humble High School Baseball Field. The ZIP code 77338 has a population of about 47,335, with a median household income of $68,808. These Census estimates provide context for the community that will benefit from the new school. The project is a major addition to the educational landscape in Humble, Harris County.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77338 (Humble)

One email per change. Unsubscribe in one click. Privacy.

Ross Sterling Middle School Replacement is a New Construction project located at Rustic Timbers Dr., Humble, TX 77338 in Humble, Texas. The project has an estimated value of $74.3M covering 213,734 sq ft. Humble Independent School District is the property owner and Kirksey Architecture is the design firm of record. The project was registered with TDLR on January 7, 2025.

Frequently Asked Questions

When is the Ross Sterling Middle School Replacement scheduled to finish?

The project is scheduled to finish in August 2027, with construction starting in June 2025. TDLR completed plan review in January 2025.

Who is the owner of the Ross Sterling Middle School Replacement project?

The owner of record is the Humble Independent School District. The design firm is Kirksey Architecture.

What is the estimated cost of the new middle school?

The estimated cost is $74,302,171. The building is 213,734 square feet, resulting in a cost of $348 per square foot.

Is the Ross Sterling Middle School Replacement open for use?

No, the project is under construction. It is scheduled to finish in August 2027. TDLR status is Review Complete, but the building is not yet operational.

What features are included in the scope of work?

The scope includes a three-story building, site paving, practice fields, and play fields. The site covers 30.4472 acres in Humble, Texas.

What is Ross Sterling Middle School Replacement?

Ross Sterling Middle School Replacement is a new construction project at Rustic Timbers Dr. in Humble, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: THREE STORY 213,734 SQUARE FOOT MIDDLE SCHOOL IS LOCATED ON THE 30.4472 ACRE SITE IN THE CITY OF HUMBLE, AND WILL INCLUDE ALL SITE PAVING, PRACTICE FIELDS, PLAY FIELDS

Is Ross Sterling Middle School Replacement open in Humble?

Ross Sterling Middle School Replacement is still under construction in Humble, TX, with an estimated completion of Aug 2027 according to its TDLR registration.

Where is Ross Sterling Middle School Replacement located?

Ross Sterling Middle School Replacement is located at Rustic Timbers Dr., Humble, TX, 77338, in Harris County.

Who is the owner or developer of Ross Sterling Middle School Replacement?

Humble Independent School District is the property owner/developer of record for Ross Sterling Middle School Replacement, per its TDLR project registration.

Who is the architect or design firm for Ross Sterling Middle School Replacement?

Kirksey Architecture is the design firm of record for Ross Sterling Middle School Replacement, according to its TDLR filing.

How much does Ross Sterling Middle School Replacement cost and how big is it?

Ross Sterling Middle School Replacement has an estimated construction value of $74.3M and approximately 213,734 square feet (about $348/sqft), based on its TDLR filing.

Scope of Work

THREE STORY 213,734 SQUARE FOOT MIDDLE SCHOOL IS LOCATED ON THE 30.4472 ACRE SITE IN THE CITY OF HUMBLE, AND WILL INCLUDE ALL SITE PAVING, PRACTICE FIELDS, PLAY FIELDS

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Rustic Timbers Dr., Humble, TX, 77338

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77338 (Humble)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.