Project intelligenceTDLR TABS2021003462Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

City of Ovilla Police Station Remodel

105 S Cockrell Hill Road, Ovilla, TX, 75154

Construction complete · Nov 2022Project Closed

City of Ovilla Police Station Remodel is a renovation/alteration project at 105 S Cockrell Hill Road, Ovilla, in Ellis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Nov 2022). The project has an estimated value of $358K across about 3,605 sq ft.

Estimated project value
$358K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,605 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$99/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 10mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Oct 29, 2020733 days across supplied datesNov 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    64 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    669 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75154 (Ovilla)

One email per change. Unsubscribe in one click. Privacy.

City of Ovilla Police Station Remodel is a Renovation/Alteration project located at 105 S Cockrell Hill Road, Ovilla, TX 75154 in Ovilla, Texas. The project has an estimated value of $358K covering 3,605 sq ft. City of Ovilla is the property owner and EIKON Consulting Group is the design firm of record. The project was registered with TDLR on October 29, 2020.

Frequently Asked Questions

What is City of Ovilla Police Station Remodel?

City of Ovilla Police Station Remodel is a renovation/alteration project at 105 S Cockrell Hill Road in Ovilla, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior remodel of existing single story police station.

Is City of Ovilla Police Station Remodel open in Ovilla?

Construction on City of Ovilla Police Station Remodel is complete — TDLR records show the project passed its required accessibility inspection in Nov 2022. The building is finished and very likely open.

Where is City of Ovilla Police Station Remodel located?

City of Ovilla Police Station Remodel is located at 105 S Cockrell Hill Road, Ovilla, TX, 75154, in Ellis County.

Who is the owner or developer of City of Ovilla Police Station Remodel?

City of Ovilla is the property owner/developer of record for City of Ovilla Police Station Remodel, per its TDLR project registration.

Who is the architect or design firm for City of Ovilla Police Station Remodel?

EIKON Consulting Group is the design firm of record for City of Ovilla Police Station Remodel, according to its TDLR filing.

How much does City of Ovilla Police Station Remodel cost and how big is it?

City of Ovilla Police Station Remodel has an estimated construction value of $358K and approximately 3,605 square feet (about $99/sqft), based on its TDLR filing.

Scope of Work

Interior remodel of existing single story police station.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

105 S Cockrell Hill Road, Ovilla, TX, 75154

Location by street address

Watch all construction in 75154 (Ovilla)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.