Project intelligenceTDLR TABS2021004005Renovation/Alteration
Funding type

This project is privately funded, on private land for private use.

Level 18 Corridor and Restroom Renovation

3 Riverway Level 18, Houston, TX, 77056

Construction complete · Mar 2021Project Closed

Level 18 Corridor and Restroom Renovation is a renovation/alteration project at 3 Riverway Level 18, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Mar 2021). The project has an estimated value of $153K across about 1,409 sq ft.

Estimated project value
$153K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,409 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$109/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 6, 2020115 days across supplied datesMar 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    17 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    98 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77056 (Houston)

One email per change. Unsubscribe in one click. Privacy.

Level 18 Corridor and Restroom Renovation is a Renovation/Alteration project located at 3 Riverway Level 18, Houston, TX 77056 in Houston, Texas. The project has an estimated value of $153K covering 1,409 sq ft. Unilev Management Group is the property owner and Goree Architects is the design firm of record. The project was registered with TDLR on November 6, 2020.

Frequently Asked Questions

What is Level 18 Corridor and Restroom Renovation?

Level 18 Corridor and Restroom Renovation is a renovation/alteration project at 3 Riverway Level 18 in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of multi-tenant corridor, elevator lobby and restrooms in existing building.

Is Level 18 Corridor and Restroom Renovation open in Houston?

Construction on Level 18 Corridor and Restroom Renovation is complete — TDLR records show the project passed its required accessibility inspection in Mar 2021. The building is finished and very likely open.

Where is Level 18 Corridor and Restroom Renovation located?

Level 18 Corridor and Restroom Renovation is located at 3 Riverway Level 18, Houston, TX, 77056, in Harris County.

Who is the owner or developer of Level 18 Corridor and Restroom Renovation?

Unilev Management Group is the property owner/developer of record for Level 18 Corridor and Restroom Renovation, per its TDLR project registration.

Who is the architect or design firm for Level 18 Corridor and Restroom Renovation?

Goree Architects is the design firm of record for Level 18 Corridor and Restroom Renovation, according to its TDLR filing.

How much does Level 18 Corridor and Restroom Renovation cost and how big is it?

Level 18 Corridor and Restroom Renovation has an estimated construction value of $153K and approximately 1,409 square feet (about $109/sqft), based on its TDLR filing.

Scope of Work

Renovation of multi-tenant corridor, elevator lobby and restrooms in existing building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Related City Permits

Building permits found at or near this location

3 RIVERWAY FL 14, Houston, TX 77056

HI-RISE OFFICE CORRIDOR & RESTRM REMODEL 1-20-1-B-A-SPK-FA '21 IBC

IssuedBuilding PmtAug 2026
HOU-26056430-BUILDINGPMT
3 RIVERWAY 1400, Houston, TX 77056

8,755 SF HI-RISE OFFICE REMODEL 1-20-1-B-A 21 IBC SPK

IssuedBuilding PmtJul 2026
HOU-26042379-BUILDINGPMT
3 RIVERWAY 900, Houston, TX 77056

HI-RISE 600 SF OFFICE REMODEL 1-20-1-B-A-100% SPK-FA 2021 IBC

IssuedBuilding PmtJul 2026
HOU-26049645-BUILDINGPMT
3 RIVERWAY 1000, Houston, TX 77056

10,194 SF OFFICE EXPANSION 1-20-1-B-A 2021 IBC SPK/FA

IssuedBuilding PmtJun 2026
HOU-26027123-BUILDINGPMT
3 RIVERWAY 1000, Houston, TX 77056

DEMO OF INTERIOR NON-LOAD BEARING NON-FIRE RATED WALLS 2021 IBC

IssuedBuilding PmtMay 2026
HOU-26038664-BUILDINGPMT

Watch all construction in 77056 (Houston)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Harris

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists