Project intelligenceTDLR TABS2021004593New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Dr. Leonides G. Cigarroa High School

2600 Zacatecas Street, Laredo, TX, 78046

Target date passed (Jun 2022)Review Complete

Dr. Leonides G. Cigarroa High School is a new construction project at 2600 Zacatecas Street, Laredo, in Webb County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $21.0M across about 93,342 sq ft.

Estimated project value
$21.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
93,342 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$225/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
1y 7mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 18, 2020583 days across supplied datesJun 24, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    19 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    564 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78046 (Laredo)

One email per change. Unsubscribe in one click. Privacy.

Dr. Leonides G. Cigarroa High School is a New Construction project located at 2600 Zacatecas Street, Laredo, TX 78046 in Laredo, Texas. The project has an estimated value of $21.0M covering 93,342 sq ft. Laredo Independent School District is the property owner and JV of Frank Architects and Hickey Pena Architects is the design firm of record. The project was registered with TDLR on November 18, 2020.

Frequently Asked Questions

What is Dr. Leonides G. Cigarroa High School?

Dr. Leonides G. Cigarroa High School is a new construction project at 2600 Zacatecas Street in Laredo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 2-story high school building, classrooms and administration offices

Is Dr. Leonides G. Cigarroa High School open in Laredo?

Dr. Leonides G. Cigarroa High School was scheduled to finish construction in Jun 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Dr. Leonides G. Cigarroa High School located?

Dr. Leonides G. Cigarroa High School is located at 2600 Zacatecas Street, Laredo, TX, 78046, in Webb County.

Who is the owner or developer of Dr. Leonides G. Cigarroa High School?

Laredo Independent School District is the property owner/developer of record for Dr. Leonides G. Cigarroa High School, per its TDLR project registration.

Who is the architect or design firm for Dr. Leonides G. Cigarroa High School?

JV of Frank Architects and Hickey Pena Architects is the design firm of record for Dr. Leonides G. Cigarroa High School, according to its TDLR filing.

How much does Dr. Leonides G. Cigarroa High School cost and how big is it?

Dr. Leonides G. Cigarroa High School has an estimated construction value of $21.0M and approximately 93,342 square feet (about $225/sqft), based on its TDLR filing.

Scope of Work

New 2-story high school building, classrooms and administration offices

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2600 Zacatecas Street, Laredo, TX, 78046

Location by street address

Watch all construction in 78046 (Laredo)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.