Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Dr. Leonides G. Cigarroa High School
2600 Zacatecas Street, Laredo, TX, 78046
Dr. Leonides G. Cigarroa High School is a new construction project at 2600 Zacatecas Street, Laredo, in Webb County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jun 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $21.0M across about 93,342 sq ft.
- Estimated project value
- $21.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 93,342 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $225/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 7mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
19 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
564 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78046 (Laredo)
One email per change. Unsubscribe in one click. Privacy.
Dr. Leonides G. Cigarroa High School is a New Construction project located at 2600 Zacatecas Street, Laredo, TX 78046 in Laredo, Texas. The project has an estimated value of $21.0M covering 93,342 sq ft. Laredo Independent School District is the property owner and JV of Frank Architects and Hickey Pena Architects is the design firm of record. The project was registered with TDLR on November 18, 2020.
Frequently Asked Questions
What is Dr. Leonides G. Cigarroa High School?
Dr. Leonides G. Cigarroa High School is a new construction project at 2600 Zacatecas Street in Laredo, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New 2-story high school building, classrooms and administration offices
Is Dr. Leonides G. Cigarroa High School open in Laredo?
Dr. Leonides G. Cigarroa High School was scheduled to finish construction in Jun 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Dr. Leonides G. Cigarroa High School located?
Dr. Leonides G. Cigarroa High School is located at 2600 Zacatecas Street, Laredo, TX, 78046, in Webb County.
Who is the owner or developer of Dr. Leonides G. Cigarroa High School?
Laredo Independent School District is the property owner/developer of record for Dr. Leonides G. Cigarroa High School, per its TDLR project registration.
Who is the architect or design firm for Dr. Leonides G. Cigarroa High School?
JV of Frank Architects and Hickey Pena Architects is the design firm of record for Dr. Leonides G. Cigarroa High School, according to its TDLR filing.
How much does Dr. Leonides G. Cigarroa High School cost and how big is it?
Dr. Leonides G. Cigarroa High School has an estimated construction value of $21.0M and approximately 93,342 square feet (about $225/sqft), based on its TDLR filing.
Scope of Work
New 2-story high school building, classrooms and administration offices
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
2600 Zacatecas Street, Laredo, TX, 78046
Watch all construction in 78046 (Laredo)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Laredo?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.