Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018)
Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) is a renovation/alteration project at 3500 Block of Brawner Parkway Between Carroll Ln. and Kostoryz Rd., Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $5.7M across about 200,000 sq ft.
๐Project Metrics
TDLR #TABS2021007213Project Closed
Project has been completed and closed
Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) is a Renovation/Alteration project located at 3500 Block of Brawner Parkway Between Carroll Ln. and Kostoryz Rd., Corpus Christi, TX 78411 in Corpus Christi, Texas. The project has an estimated value of $5.7M covering 200,000 sq ft. City of Corpus Christi is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on January 9, 2021.
โFrequently Asked Questions
What is Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018)?
Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) is a renovation/alteration project at 3500 Block of Brawner Parkway Between Carroll Ln. and Kostoryz Rd. in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Linear roadway project with sidewalks/curb ramps
Is Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) open in Corpus Christi?
Construction on Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) is complete โ TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.
Where is Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) located?
Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) is located at 3500 Block of Brawner Parkway Between Carroll Ln. and Kostoryz Rd., Corpus Christi, TX, 78411, in Nueces County.
Who is the owner or developer of Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018)?
City of Corpus Christi is the property owner/developer of record for Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018), per its TDLR project registration.
Who is the architect or design firm for Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018)?
Freese and Nichols, Inc. is the design firm of record for Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018), according to its TDLR filing.
How much does Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) cost and how big is it?
Brawner Parkway - Carroll Ln. to Kostoryz Rd. (Bond 2018) has an estimated construction value of $5.7M and approximately 200,000 square feet (about $29/sqft), based on its TDLR filing.
๐Scope of Work
Linear roadway project with sidewalks/curb ramps
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
Jan 9, 2021
Review Complete
Inspection Complete
Closed
Jul 29, 2022