25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue in Corpus Christi, TX
District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX, 78414
25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue is a new construction project at District 5, Corpus Christi, Texas, 78414, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Oct 2026 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $340K across about 1,000 sq ft.
- Estimated project value
- $340K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $340/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
10 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
45 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue
District 5 Trail - Boardwalk Avenue to Lipes Avenue is a new construction project in District 5, Corpus Christi, Texas. The City of Corpus Christi is installing a new 8-foot-wide concrete sidewalk connecting Boardwalk Avenue and Master Channel 31 to Lipes Boulevard. This 1,000-square-foot project is scheduled to finish in October 2026. Construction starts in August 2026, creating a 45-day build window.
The scope of work includes the installation of ADA ramps and crosswalk pavement markings at Boardwalk Boulevard. The estimated cost for District 5 Trail - Boardwalk Avenue to Lipes Avenue is $340,372. Emily Rozypal is the registered accessibility specialist of record. The City of Corpus Christi - Engineering Services serves as the design firm of record for this filing.
Project Context and Status
TDLR completed plan review in August 2026. The TDLR status for this project is Review Complete. This project involves public funds, public land, or is a Federally funded roadway project.
In Nueces County, the median estimated cost for new construction filings is $657,390. This project’s cost is below that county median. The median size for similar filings is 6,700 square feet, while this project is 1,000 square feet. The median cost per square foot in the county is $118, whereas this project is $340 per square foot. The scheduled build window of 45 days is shorter than the county median of 242 days.
The City of Corpus Christi has six other TDLR-registered projects totaling $157,603,698. These include the Oso WRP and Reclaimed Water Transmission Main, valued at $108,000,000, and the North Padre Island Seawall, valued at $16,787,598. The design firm, City of Corpus Christi - Engineering Services, has two other registered projects totaling $219,141, both located in Corpus Christi.
Census estimates for ZIP code 78414 indicate a population of about 51,435. The median household income in this area is $96,788. There are 20,121 housing units, and the median owner-occupied home value is $271,300. Housing in this area is mostly owner-occupied. The Nueces County unemployment rate was 4.9 percent in July 2026, which is higher than a year earlier.
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78414 (Corpus Christi)
One email per change. Unsubscribe in one click. Privacy.
25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue is a New Construction project located at District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX 78414 in Corpus Christi, Texas. The project has an estimated value of $340K covering 1,000 sq ft. City of Corpus Christi is the property owner and City of Corpus Christi - Engineering Services is the design firm of record. The project was registered with TDLR on August 11, 2026.
Frequently Asked Questions
When is the District 5 Trail - Boardwalk Avenue to Lipes Avenue project scheduled to finish?
The project is scheduled to finish in October 2026. Construction is set to start in August 2026, with a total build window of 45 days.
What is the estimated cost of the new sidewalk installation?
The estimated cost for the new 8-foot-wide concrete sidewalk and associated ADA ramps is $340,372. This figure covers the 1,000 square feet of new construction.
Who is the owner and design firm for this project?
The City of Corpus Christi is the owner of record. The City of Corpus Christi - Engineering Services is the registered design firm of record for the project.
Is the project site in a flood zone?
According to the FEMA National Flood Hazard Layer, the site coordinates fall within zone X.
What specific features are included in the scope of work?
The scope includes a new 8-foot-wide concrete sidewalk from Boardwalk Avenue to Lipes Boulevard. It also includes ADA ramps and crosswalk pavement markings at Boardwalk Boulevard.
What is 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue?
25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue is a new construction project at District 5, Corpus Christi, Texas, 78414 in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of a new 8' wide concrete sidewalk starting at Boardwalk Avenue & Master Channel 31 to Lipes Boulevard. Scope also includes ADA ramps, and crosswalk pavement markings at Boardwalk Boulevard.
Is 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue open in Corpus Christi?
25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue was scheduled to finish construction in Oct 2026 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue located?
25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue is located at District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX, 78414, in Nueces County.
Who is the owner or developer of 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue?
City of Corpus Christi is the property owner/developer of record for 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue, per its TDLR project registration.
Who is the architect or design firm for 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue?
City of Corpus Christi - Engineering Services is the design firm of record for 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue, according to its TDLR filing.
How much does 25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue cost and how big is it?
25044 - District 5 Trail Connectivity - Phase I - Boardwalk Avenue to Lipes Avenue has an estimated construction value of $340K and approximately 1,000 square feet (about $340/sqft), based on its TDLR filing.
Scope of Work
Installation of a new 8' wide concrete sidewalk starting at Boardwalk Avenue & Master Channel 31 to Lipes Boulevard. Scope also includes ADA ramps, and crosswalk pavement markings at Boardwalk Boulevard.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX, 78414
Related Projects
Same Owner
$912.4M totalSame Design Firm
$1.1M totalWatch all construction in 78414 (Corpus Christi)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Corpus Christi?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.