Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard in Corpus Christi, TX
District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX, 78413
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard is a new construction project at District 5, Corpus Christi, Texas, 78414, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Nov 2026. The project has an estimated value of $534K across about 1,000 sq ft.
- Estimated project value
- $534K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $534/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
6 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
40 days after the preceding date shown.
Source: TDLR filing
View source record
📰About 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard
The City of Corpus Christi is constructing the District 5 Trail - Lipes Boulevard to York Crossing Boulevard, a new 8-foot-wide concrete sidewalk and pedestrian bridge in District 5. This project spans 1,000 square feet and includes a bridge crossing over Master Channel 31. The estimated cost for this infrastructure work is $534,202.
The project is registered with the Texas Department of Licensing and Regulation (TDLR) under the accessibility program. Plan review is pending, and the construction window is targeted for November 2026. The filing indicates a start date of October 2026, creating a scheduled build window of 40 days. This timeline is shorter than the median scheduled build window of 240 days for similar new construction filings in Nueces County.
Project Scope and Location
The work involves installing a concrete sidewalk starting at the intersection of Lipes Boulevard and Master Channel 31, extending to York Crossing Boulevard. A key component is the installation of a pedestrian bridge that crosses over Master Channel 31. This connection facilitates safe passage for residents and pedestrians moving between the two thoroughfares in the 78414 and 78413 ZIP code areas.
The City of Corpus Christi serves as both the owner and the design firm of record through its Engineering Services department. Emily Rozypal is the registered accessibility specialist for this filing. The project utilizes public funds and takes place on public land. The City has six other TDLR-registered projects totaling $22,040,116, including the Don and Sandy Skate Park and the Hilliard Center. This specific trail segment is part of a broader network, with a similar project from Boardwalk Avenue to Lipes Avenue having completed review.
Cost and Market Context
The estimated cost of $534,202 places this project below the median estimated cost of $662,000 for new construction in Nueces County. However, the cost per square foot is $534, which is above the county median of $118 per square foot. This variance reflects the specialized nature of bridge installation and concrete sidewalk work compared to larger commercial structures. The project size of 1,000 square feet is smaller than the median size of 6,700 square feet for comparable filings in the region.
Residents in the 78413 ZIP code, where the median household income is $71,624, will benefit from this improved pedestrian infrastructure. The project supports local mobility and safety in a community with a population of about 35,103. The Nueces County unemployment rate was 4.6 percent in August 2026, indicating a stable labor market during the construction period. The City of Corpus Christi continues to develop trail systems to enhance connectivity within the district.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78413 (Corpus Christi)
One email per change. Unsubscribe in one click. Privacy.
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard is a New Construction project located at District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX 78413 in Corpus Christi, Texas. The project has an estimated value of $534K covering 1,000 sq ft. City of Corpus Christi is the property owner and City of Corpus Christi - Engineering Services is the design firm of record. The project was registered with TDLR on October 15, 2026.
Frequently Asked Questions
What is the scope of the District 5 Trail project?
The project includes installing a new 8-foot-wide concrete sidewalk and a pedestrian bridge over Master Channel 31, connecting Lipes Boulevard to York Crossing Boulevard.
When is the project targeted for completion?
The project is targeted for November 2026, with a scheduled construction start in October 2026 and a 40-day build window.
Who is the owner and design firm for this project?
The City of Corpus Christi is the owner, and the City of Corpus Christi - Engineering Services is the design firm of record.
What is the estimated cost of the project?
The estimated cost is $534,202, which is below the Nueces County median for new construction but has a higher cost per square foot than the county median.
What is 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard?
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard is a new construction project at District 5, Corpus Christi, Texas, 78414 in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of new 8' wide concrete sidewalk starting at Lipes Boulevard & Master Channel 31 to York Crossing Boulevard. The project scope also includes the installation of a pedestrian bridge crossing over master channel 31 and connect…
Is 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard open in Corpus Christi?
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard is still under construction in Corpus Christi, TX, with an estimated completion of Nov 2026 according to its TDLR registration.
Where is 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard located?
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard is located at District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX, 78413, in Nueces County.
Who is the owner or developer of 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard?
City of Corpus Christi is the property owner/developer of record for 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard, per its TDLR project registration.
Who is the architect or design firm for 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard?
City of Corpus Christi - Engineering Services is the design firm of record for 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard, according to its TDLR filing.
How much does 25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard cost and how big is it?
25044 - District 5 Trail Connectivity - Phase II - Lipes Boulevard to York Crossing Boulevard has an estimated construction value of $534K and approximately 1,000 square feet (about $534/sqft), based on its TDLR filing.
Scope of Work
Installation of new 8' wide concrete sidewalk starting at Lipes Boulevard & Master Channel 31 to York Crossing Boulevard. The project scope also includes the installation of a pedestrian bridge crossing over master channel 31 and connecting to York
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
District 5, Corpus Christi, Texas, 78414, Corpus Christi, TX, 78413
Related Projects
Same Owner
$5.4M totalSame Design Firm
$1.1M totalWatch all construction in 78413 (Corpus Christi)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Corpus Christi?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.