Project intelligenceTDLR TABS2021010251Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Addition to the Airport Pump Station

Draughon-Miller Central Texas Regional Airport 7720 Airport Rd, Temple, TX, 76502

Construction complete · Jul 2021Project Closed

Addition to the Airport Pump Station is a additions to existing building project at Draughon-Miller Central Texas Regional Airport 7720 Airport Rd, Temple, in Bell County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2021). The project has an estimated value of $125K across about 600 sq ft.

Estimated project value
$125K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
600 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$208/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 2, 2021121 days across supplied datesJul 1, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    30 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76502 (Temple)

One email per change. Unsubscribe in one click. Privacy.

Addition to the Airport Pump Station is a Additions to Existing Building project located at Draughon-Miller Central Texas Regional Airport 7720 Airport Rd, Temple, TX 76502 in Temple, Texas. The project has an estimated value of $125K covering 600 sq ft. City of Temple is the property owner and MRB Group is the design firm of record. The project was registered with TDLR on March 2, 2021.

Frequently Asked Questions

What is Addition to the Airport Pump Station?

Addition to the Airport Pump Station is a additions to existing building project at Draughon-Miller Central Texas Regional Airport 7720 Airport Rd in Temple, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Extension of the existing CMU and wood framed building approx. 20' x 30' to house an existing generator.

Is Addition to the Airport Pump Station open in Temple?

Construction on Addition to the Airport Pump Station is complete — TDLR records show the project passed its required accessibility inspection in Jul 2021. The building is finished and very likely open.

Where is Addition to the Airport Pump Station located?

Addition to the Airport Pump Station is located at Draughon-Miller Central Texas Regional Airport 7720 Airport Rd, Temple, TX, 76502, in Bell County.

Who is the owner or developer of Addition to the Airport Pump Station?

City of Temple is the property owner/developer of record for Addition to the Airport Pump Station, per its TDLR project registration.

Who is the architect or design firm for Addition to the Airport Pump Station?

MRB Group is the design firm of record for Addition to the Airport Pump Station, according to its TDLR filing.

How much does Addition to the Airport Pump Station cost and how big is it?

Addition to the Airport Pump Station has an estimated construction value of $125K and approximately 600 square feet (about $208/sqft), based on its TDLR filing.

Scope of Work

Extension of the existing CMU and wood framed building approx. 20' x 30' to house an existing generator.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Draughon-Miller Central Texas Regional Airport 7720 Airport Rd, Temple, TX, 76502

Location by street address

Watch all construction in 76502 (Temple)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.