Project intelligenceTDLR TABS2021010373Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

EVERMAN FIRE STATION - REMODEL

400 W ENON AVE, Everman, TX, 76140

Construction complete · Jan 2022Project Closed

EVERMAN FIRE STATION - REMODEL is a renovation/alteration project at 400 W ENON AVE, Everman, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jan 2022). The project has an estimated value of $800K across about 3,526 sq ft.

Estimated project value
$800K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
3,526 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$227/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
8 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 4, 2021303 days across supplied datesJan 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    58 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    245 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76140 (Everman)

One email per change. Unsubscribe in one click. Privacy.

EVERMAN FIRE STATION - REMODEL is a Renovation/Alteration project located at 400 W ENON AVE, Everman, TX 76140 in Everman, Texas. The project has an estimated value of $800K covering 3,526 sq ft. CITY OF EVERMAN is the property owner and GROSSMAN DESIGN BUILD is the design firm of record. The project was registered with TDLR on March 4, 2021.

Frequently Asked Questions

What is EVERMAN FIRE STATION - REMODEL?

EVERMAN FIRE STATION - REMODEL is a renovation/alteration project at 400 W ENON AVE in Everman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: ADDING A NEW BUNK AND OFFICE ROOMS ALONG WITH SOME STORAGE AND A DAY ROOM AND KITCHEN TO THE EXISTING STATION

Is EVERMAN FIRE STATION - REMODEL open in Everman?

Construction on EVERMAN FIRE STATION - REMODEL is complete — TDLR records show the project passed its required accessibility inspection in Jan 2022. The building is finished and very likely open.

Where is EVERMAN FIRE STATION - REMODEL located?

EVERMAN FIRE STATION - REMODEL is located at 400 W ENON AVE, Everman, TX, 76140, in Tarrant County.

Who is the owner or developer of EVERMAN FIRE STATION - REMODEL?

CITY OF EVERMAN is the property owner/developer of record for EVERMAN FIRE STATION - REMODEL, per its TDLR project registration.

Who is the architect or design firm for EVERMAN FIRE STATION - REMODEL?

GROSSMAN DESIGN BUILD is the design firm of record for EVERMAN FIRE STATION - REMODEL, according to its TDLR filing.

How much does EVERMAN FIRE STATION - REMODEL cost and how big is it?

EVERMAN FIRE STATION - REMODEL has an estimated construction value of $800K and approximately 3,526 square feet (about $227/sqft), based on its TDLR filing.

Scope of Work

ADDING A NEW BUNK AND OFFICE ROOMS ALONG WITH SOME STORAGE AND A DAY ROOM AND KITCHEN TO THE EXISTING STATION

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

400 W ENON AVE, Everman, TX, 76140

Location by street address

Watch all construction in 76140 (Everman)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.