Project intelligenceTDLR TABS2027000502Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

EVERMAN CITY HALL

212 N RACE ST, Everman, TX, 76140

Opening ~Jun 2027Review Complete

EVERMAN CITY HALL is a additions to existing building project at 212 N RACE ST, Everman, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Jun 2027. The project has an estimated value of $1.0M across about 9,038 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
9,038 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$111/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
5 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

Explore the linked construction record and source history

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 8, 2026266 days across supplied datesJun 1, 2027

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    32 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    83 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    151 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About EVERMAN CITY HALL

Everman City Hall is undergoing a $1,000,000 expansion at 212 N Race St in Everman, Tarrant County. This addition to the existing building covers 9,038 sq ft and is targeted for June 2027. The project was registered with TDLR in September 2026, with plan review pending.

Grossman Design Build serves as the design firm of record for Everman City Hall. The scope of work includes the addition of offices, clerk desks, and council chambers. Dianne Ford is the registered accessibility specialist assigned to the project. The estimated cost per square foot is $111.

Project Context and Comparison

In Tarrant County, the median estimated cost for similar additions to existing buildings is $700,000. This project’s cost is above that county median. The median size for these filings is 5,400 sq ft, while this project is larger at 9,038 sq ft. The median cost per square foot in the county is $173, making this project’s $111 per square foot below the median. The scheduled build window is 151 days, which is close to the county median of 186 days.

The City of Everman has two other TDLR-registered projects totaling $2,900,000. These include the Everman City Annex in Fort Worth and the City of Everman Fire Station, both of which are closed projects. Grossman Design Build has six other TDLR-registered projects totaling $29,000,000, including facilities in Weatherford, College Station, Heath, and Waxahachie.

Census estimates for ZIP code 76140 indicate a population of about 31,693 and a median household income of $73,215. The Tarrant County unemployment rate was 4.6 percent in July 2026, higher than a year earlier.

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76140 (Everman)

One email per change. Unsubscribe in one click. Privacy.

EVERMAN CITY HALL is a Additions to Existing Building project located at 212 N RACE ST, Everman, TX 76140 in Everman, Texas. The project has an estimated value of $1.0M covering 9,038 sq ft. CITY OF EVERMAN is the property owner and GROSSMAN DESIGN BUILD is the design firm of record. The project was registered with TDLR on September 8, 2026.

Frequently Asked Questions

What is the estimated cost of the Everman City Hall expansion?

The estimated cost for the Everman City Hall expansion is $1,000,000. This figure covers the addition of 9,038 sq ft of new space including offices and council chambers.

Who is the design firm for this project?

Grossman Design Build is the design firm of record. They are responsible for the design aspects of the city hall expansion in Everman.

When is the project targeted for completion?

The project is targeted for June 2027. Construction is scheduled to begin in January 2027 following the registration in September 2026.

Is the Everman City Hall expansion open to the public now?

No, the project is under construction. The TDLR record shows the status as Project Registered with plan review pending, and it is targeted for June 2027.

What is EVERMAN CITY HALL?

EVERMAN CITY HALL is a additions to existing building project at 212 N RACE ST in Everman, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: OFFICES, CLERK DESKS, COUNCIL CHAMBERS

Is EVERMAN CITY HALL open in Everman?

EVERMAN CITY HALL is still under construction in Everman, TX, with an estimated completion of Jun 2027 according to its TDLR registration.

Where is EVERMAN CITY HALL located?

EVERMAN CITY HALL is located at 212 N RACE ST, Everman, TX, 76140, in Tarrant County.

Who is the owner or developer of EVERMAN CITY HALL?

CITY OF EVERMAN is the property owner/developer of record for EVERMAN CITY HALL, per its TDLR project registration.

Who is the architect or design firm for EVERMAN CITY HALL?

GROSSMAN DESIGN BUILD is the design firm of record for EVERMAN CITY HALL, according to its TDLR filing.

How much does EVERMAN CITY HALL cost and how big is it?

EVERMAN CITY HALL has an estimated construction value of $1.0M and approximately 9,038 square feet (about $111/sqft), based on its TDLR filing.

Scope of Work

OFFICES, CLERK DESKS, COUNCIL CHAMBERS

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

212 N RACE ST, Everman, TX, 76140

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 76140 (Everman)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.