Project intelligenceTDLR TABS2021014749Additions to Existing Building
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Smith Middle School Addition - Phase 1

900 S. San Patricio St., Sinton, TX, 78387

Construction complete · Aug 2021Project Closed

Smith Middle School Addition - Phase 1 is a additions to existing building project at 900 S. San Patricio St., Sinton, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $1.2M across about 1 sq ft.

Estimated project value
$1.2M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$1200.00K/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 3, 2021103 days across supplied datesAug 14, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    29 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    74 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78387 (Sinton)

One email per change. Unsubscribe in one click. Privacy.

Smith Middle School Addition - Phase 1 is a Additions to Existing Building project located at 900 S. San Patricio St., Sinton, TX 78387 in Sinton, Texas. The project has an estimated value of $1.2M covering 1 sq ft. Sinton ISD is the property owner and Corgan is the design firm of record. The project was registered with TDLR on May 3, 2021.

Frequently Asked Questions

What is Smith Middle School Addition - Phase 1?

Smith Middle School Addition - Phase 1 is a additions to existing building project at 900 S. San Patricio St. in Sinton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of track and 4 tennis courts to existing school site, along with sidewalk from building.

Is Smith Middle School Addition - Phase 1 open in Sinton?

Construction on Smith Middle School Addition - Phase 1 is complete — TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.

Where is Smith Middle School Addition - Phase 1 located?

Smith Middle School Addition - Phase 1 is located at 900 S. San Patricio St., Sinton, TX, 78387, in San Patricio County.

Who is the owner or developer of Smith Middle School Addition - Phase 1?

Sinton ISD is the property owner/developer of record for Smith Middle School Addition - Phase 1, per its TDLR project registration.

Who is the architect or design firm for Smith Middle School Addition - Phase 1?

Corgan is the design firm of record for Smith Middle School Addition - Phase 1, according to its TDLR filing.

How much does Smith Middle School Addition - Phase 1 cost and how big is it?

Smith Middle School Addition - Phase 1 has an estimated construction value of $1.2M and approximately 1 square feet (about $1200.00K/sqft), based on its TDLR filing.

Scope of Work

Addition of track and 4 tennis courts to existing school site, along with sidewalk from building.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

900 S. San Patricio St., Sinton, TX, 78387

28.02854, -97.51683

Watch all construction in 78387 (Sinton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.