Smith Middle School Addition - Phase 1
Smith Middle School Addition - Phase 1 is a additions to existing building project at 900 S. San Patricio St., Sinton, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2021). The project has an estimated value of $1.2M across about 1 sq ft.
๐Project Metrics
TDLR #TABS2021014749Project Closed
Project has been completed and closed
Smith Middle School Addition - Phase 1 is a Additions to Existing Building project located at 900 S. San Patricio St., Sinton, TX 78387 in Sinton, Texas. The project has an estimated value of $1.2M covering 1 sq ft. Sinton ISD is the property owner and Corgan is the design firm of record. The project was registered with TDLR on May 3, 2021.
โFrequently Asked Questions
What is Smith Middle School Addition - Phase 1?
Smith Middle School Addition - Phase 1 is a additions to existing building project at 900 S. San Patricio St. in Sinton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Addition of track and 4 tennis courts to existing school site, along with sidewalk from building.
Is Smith Middle School Addition - Phase 1 open in Sinton?
Construction on Smith Middle School Addition - Phase 1 is complete โ TDLR records show the project passed its required accessibility inspection in Aug 2021. The building is finished and very likely open.
Where is Smith Middle School Addition - Phase 1 located?
Smith Middle School Addition - Phase 1 is located at 900 S. San Patricio St., Sinton, TX, 78387, in San Patricio County.
Who is the owner or developer of Smith Middle School Addition - Phase 1?
Sinton ISD is the property owner/developer of record for Smith Middle School Addition - Phase 1, per its TDLR project registration.
Who is the architect or design firm for Smith Middle School Addition - Phase 1?
Corgan is the design firm of record for Smith Middle School Addition - Phase 1, according to its TDLR filing.
How much does Smith Middle School Addition - Phase 1 cost and how big is it?
Smith Middle School Addition - Phase 1 has an estimated construction value of $1.2M and approximately 1 square feet (about $1200.00K/sqft), based on its TDLR filing.
๐Scope of Work
Addition of track and 4 tennis courts to existing school site, along with sidewalk from building.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 3, 2021
Review Complete
Inspection Complete
Closed
Aug 14, 2021