Project intelligenceTDLR TABS2024019607New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

San Patricio County Logistics Center in Sinton, TX

219 W. 5th Street, Bldg. #6, Sinton, TX, 78387

Construction complete · Jul 2025Project Closed

San Patricio County Logistics Center is a new construction project at 219 W. 5th Street, Bldg. #6, Sinton, in San Patricio County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2025). The project has an estimated value of $1.0M across about 2,080 sq ft.

Estimated project value
$1.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
2,080 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$481/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
10 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 29, 2024401 days across supplied datesJul 4, 2025

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    96 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    305 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78387 (Sinton)

One email per change. Unsubscribe in one click. Privacy.

San Patricio County Logistics Center is a New Construction project located at 219 W. 5th Street, Bldg. #6, Sinton, TX 78387 in Sinton, Texas. The project has an estimated value of $1.0M covering 2,080 sq ft. San Patricio County is the property owner and Cutright & Prihoda is the design firm of record. The project was registered with TDLR on May 29, 2024.

Frequently Asked Questions

What is San Patricio County Logistics Center?

San Patricio County Logistics Center is a new construction project at 219 W. 5th Street, Bldg. #6 in Sinton, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New construction

Is San Patricio County Logistics Center open in Sinton?

Construction on San Patricio County Logistics Center is complete — TDLR records show the project passed its required accessibility inspection in Jul 2025. The building is finished and very likely open.

Where is San Patricio County Logistics Center located?

San Patricio County Logistics Center is located at 219 W. 5th Street, Bldg. #6, Sinton, TX, 78387, in San Patricio County.

Who is the owner or developer of San Patricio County Logistics Center?

San Patricio County is the property owner/developer of record for San Patricio County Logistics Center, per its TDLR project registration.

Who is the architect or design firm for San Patricio County Logistics Center?

Cutright & Prihoda is the design firm of record for San Patricio County Logistics Center, according to its TDLR filing.

How much does San Patricio County Logistics Center cost and how big is it?

San Patricio County Logistics Center has an estimated construction value of $1.0M and approximately 2,080 square feet (about $481/sqft), based on its TDLR filing.

Scope of Work

New construction

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

219 W. 5th Street, Bldg. #6, Sinton, TX, 78387

Loading location map…
28.02822, -97.51298

Watch all construction in 78387 (Sinton)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.