Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Stony Point High School Maker Space Renovation
1801 Tiger Trail, Round Rock, TX, 78664
Stony Point High School Maker Space Renovation is a renovation/alteration project at 1801 Tiger Trail, Round Rock, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Oct 2021). The project has an estimated value of $150K across about 550 sq ft.
- Estimated project value
- $150K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 550 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $273/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
22 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
106 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78664 (Round Rock)
One email per change. Unsubscribe in one click. Privacy.
Stony Point High School Maker Space Renovation is a Renovation/Alteration project located at 1801 Tiger Trail, Round Rock, TX 78664 in Round Rock, Texas. The project has an estimated value of $150K covering 550 sq ft. Round Rock ISD is the property owner and Pfluger Architects is the design firm of record. The project was registered with TDLR on June 9, 2021.
Frequently Asked Questions
What is Stony Point High School Maker Space Renovation?
Stony Point High School Maker Space Renovation is a renovation/alteration project at 1801 Tiger Trail in Round Rock, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Reconfiguration of rooms for maker space. Interior finishes and MEP work.
Is Stony Point High School Maker Space Renovation open in Round Rock?
Construction on Stony Point High School Maker Space Renovation is complete — TDLR records show the project passed its required accessibility inspection in Oct 2021. The building is finished and very likely open.
Where is Stony Point High School Maker Space Renovation located?
Stony Point High School Maker Space Renovation is located at 1801 Tiger Trail, Round Rock, TX, 78664, in Williamson County.
Who is the owner or developer of Stony Point High School Maker Space Renovation?
Round Rock ISD is the property owner/developer of record for Stony Point High School Maker Space Renovation, per its TDLR project registration.
Who is the architect or design firm for Stony Point High School Maker Space Renovation?
Pfluger Architects is the design firm of record for Stony Point High School Maker Space Renovation, according to its TDLR filing.
How much does Stony Point High School Maker Space Renovation cost and how big is it?
Stony Point High School Maker Space Renovation has an estimated construction value of $150K and approximately 550 square feet (about $273/sqft), based on its TDLR filing.
Scope of Work
Reconfiguration of rooms for maker space. Interior finishes and MEP work.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1801 Tiger Trail, Round Rock, TX, 78664
Related Projects
Same Owner
$442.5M totalRelated City Permits
Building permits found at or near this location
Meter rack. Ref 2026-064911 EP and 2026-064912 EP.
Construct new driveway approach of 12 FT. No sidewalk inspection per plan review.
Bldg 2 New Construction of 2-Story Single Family Res. [3bed 2.5bath] with attached carport
ePlan: Residential Expedited Review - New Autofill/Heated Pool. Unit A
Express- Replace siding around house exterior and around electrical box. Electrical Permit
Watch all construction in 78664 (Round Rock)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Round Rock?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.