High Point 67 is a new construction project at US Highway 67 North, Cedar Hill, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2022). The project has an estimated value of $39.3M across about 1,087,829 sq ft.

Estimated project value
$39.3M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,087,829 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$36/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
9 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jun 14, 2021321 days across supplied datesMay 1, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    48 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    273 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

📰About High Point 67

High Point 67 is a new 1,087,829-square-foot cold dark shell building located on US Highway 67 North in Cedar Hill, Texas. The project, filed under the name Building 2, was registered with the Texas Department of Licensing and Regulation (TDLR) in June 2021. TDLR closed the project file in May 2022, which marks the end of the accessibility review process for this construction.

The estimated cost for this single-story facility was $39,315,623. This figure places the project in the top quarter of estimated costs among 8,217 new construction filings in Dallas County. The cost per square foot is $36, which is below the county median of $125 per square foot. The scheduled build window was 273 days, close to the county median of 243 days.

USICV High Point 67 Lot 2, Inc. is the owner of record for the project. The design firm of record is GSR Andrade Architects. This firm has registered six other projects with TDLR, totaling $44,199,000. These include Park 25 in Frisco, I-20 Logistics Park in Dallas, and Building 3 in Midlothian. The project is privately funded on private land for private use.

Local coverage and third-party mentions provide additional context. A post by Pratt Industries described Cedar Hill as its 71st factory in the USA. NBC DFW reported that the High Point 67 Logistics Center is expected to generate jobs. A site plan application from the City of Cedar Hill lists USICV High Point 67 Lot 3, Inc. and Hillwood as applicants.

The construction start date per the filing was August 2021, with a completion date of May 2022. The TDLR status is Project Closed. The project is located in ZIP code 75104, which has a population of about 49,425 and a median household income of $91,147. Dallas County unemployment rate was 3.3 percent in July 2026.

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75104 (Cedar Hill)

One email per change. Unsubscribe in one click. Privacy.

High Point 67 is a New Construction project located at US Highway 67 North, Cedar Hill, TX 75104 in Cedar Hill, Texas. The project has an estimated value of $39.3M covering 1,087,829 sq ft. USICV High Point 67 Lot 2, Inc. is the property owner and GSR Andrade Architects is the design firm of record. The project was registered with TDLR on June 14, 2021.

Frequently Asked Questions

Is the High Point 67 building open for business?

The TDLR record shows the construction project file was closed in May 2022. Third-party mentions report that Pratt Industries began hiring for the facility, but the construction record does not confirm a specific opening date.

Who is the developer of High Point 67?

The owner of record is USICV High Point 67 Lot 2, Inc. The design firm of record is GSR Andrade Architects.

How large is the High Point 67 facility?

The building is 1,087,829 square feet and is a single-story cold dark shell structure.

What was the estimated cost of the project?

The estimated cost was $39,315,623, which is above the county median for new construction in Dallas County.

Where is High Point 67 located?

The project is located on US Highway 67 North in Cedar Hill, Texas, within Dallas County.

What is High Point 67?

High Point 67 is a new construction project at US Highway 67 North in Cedar Hill, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: 1,087,829 square foot 1 story Cold dark shell building with site improvements including sidewalks, parking, etc.

Is High Point 67 open in Cedar Hill?

Construction on High Point 67 is complete — TDLR records show the project passed its required accessibility inspection in May 2022. The building is finished and very likely open.

Who is the owner or developer of High Point 67?

USICV High Point 67 Lot 2, Inc. is the property owner/developer of record for High Point 67, per its TDLR project registration.

Who is the architect or design firm for High Point 67?

GSR Andrade Architects is the design firm of record for High Point 67, according to its TDLR filing.

How much does High Point 67 cost and how big is it?

High Point 67 has an estimated construction value of $39.3M and approximately 1,087,829 square feet (about $36/sqft), based on its TDLR filing.

Scope of Work

1,087,829 square foot 1 story Cold dark shell building with site improvements including sidewalks, parking, etc.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

US Highway 67 North, Cedar Hill, TX, 75104

Location by street address

Watch all construction in 75104 (Cedar Hill)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Cedar Hill?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.