Project intelligenceTDLR TABS2021020252New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Sienna Section 37 Sitework, Landscape & Irrigation in Missouri City, TX

1721 1/2 Sienna Oaks Drive, Missouri City, TX, 77459

Construction complete · Dec 2021Project Closed

Sienna Section 37 Sitework, Landscape & Irrigation is a new construction project at 1721 1/2 Sienna Oaks Drive, Missouri City, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2021). The project has an estimated value of $185K across about 70,000 sq ft.

Estimated project value
$185K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
70,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$3/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Jul 21, 2021163 days across supplied datesDec 31, 2021

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    42 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    121 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77459 (Missouri City)

One email per change. Unsubscribe in one click. Privacy.

Sienna Section 37 Sitework, Landscape & Irrigation is a New Construction project located at 1721 1/2 Sienna Oaks Drive, Missouri City, TX 77459 in Missouri City, Texas. The project has an estimated value of $185K covering 70,000 sq ft. Sienna MUD 5 c/o Toll-GTIS Property Owner, LLC is the property owner and TBG Partners is the design firm of record. The project was registered with TDLR on July 21, 2021.

Frequently Asked Questions

What is Sienna Section 37 Sitework, Landscape & Irrigation?

Sienna Section 37 Sitework, Landscape & Irrigation is a new construction project at 1721 1/2 Sienna Oaks Drive in Missouri City, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Installation of concrete sidewalks, landscape enhancements and irrigation

Is Sienna Section 37 Sitework, Landscape & Irrigation open in Missouri City?

Construction on Sienna Section 37 Sitework, Landscape & Irrigation is complete — TDLR records show the project passed its required accessibility inspection in Dec 2021. The building is finished and very likely open.

Where is Sienna Section 37 Sitework, Landscape & Irrigation located?

Sienna Section 37 Sitework, Landscape & Irrigation is located at 1721 1/2 Sienna Oaks Drive, Missouri City, TX, 77459, in Fort Bend County.

Who is the owner or developer of Sienna Section 37 Sitework, Landscape & Irrigation?

Sienna MUD 5 c/o Toll-GTIS Property Owner, LLC is the property owner/developer of record for Sienna Section 37 Sitework, Landscape & Irrigation, per its TDLR project registration.

Who is the architect or design firm for Sienna Section 37 Sitework, Landscape & Irrigation?

TBG Partners is the design firm of record for Sienna Section 37 Sitework, Landscape & Irrigation, according to its TDLR filing.

How much does Sienna Section 37 Sitework, Landscape & Irrigation cost and how big is it?

Sienna Section 37 Sitework, Landscape & Irrigation has an estimated construction value of $185K and approximately 70,000 square feet (about $3/sqft), based on its TDLR filing.

Scope of Work

Installation of concrete sidewalks, landscape enhancements and irrigation

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

1721 1/2 Sienna Oaks Drive, Missouri City, TX, 77459

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Watch all construction in 77459 (Missouri City)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Missouri City?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.