AISD Lamar Middle School Additions & Renovations
๐Project Metrics
TDLR #TABS2021022494Inspection Complete
Final inspection completed, awaiting project closure
๐Scope of Work
New fine arts additions to two existing buildings with associated mechanical, plumbing, electrical, and site work. Also included are interior renovations to existing buildings that are being added on to.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐Related Projects
๐คSame Owner
$72.7M total๐๏ธSame Design Firm
$116.8M total๐Related City Permits
Building permits found at or near this location
Install Washer and Dryer with all Associated Infrastructure.
Interior Remodel Interior remodel of 1st floor kitchen and mudroom 2nd floor primary bedroom bath and home office addition of sliding door on 2nd floor covered terrace
Total demo of a SFR 4802 sq ft circa 2000
Garage 1693 sq ft circa 1959
200-Amp meter and Main Panel Upgrade