Project intelligenceTDLR TABS2022000347New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

FBISD MIDDLE SCHOOL 16

22200 S POST OAK BLVD, Fresno, TX, 77545

Construction complete · Jul 2026Inspection Complete

FBISD MIDDLE SCHOOL 16 is a new construction project at 22200 S POST OAK BLVD, Fresno, in Fort Bend County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2026). The project has an estimated value of $75.0M across about 240,000 sq ft.

Estimated project value
$75.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
240,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$313/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 11mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Sep 7, 20211,910 days across supplied datesNov 30, 2026

5 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    850 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    927 days after the preceding date shown.

    Source: TDLR filing

    View source record
  5. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    133 days after the preceding date shown.

    Source: TDLR filing

    View source record

📰About FBISD MIDDLE SCHOOL 16

Fort Bend Independent School District completed the ground-up construction of Fbisd Middle School 16 at 22200 S Post Oak Blvd in Fresno. This 240,000-square-foot facility was registered with the Texas Department of Licensing and Regulation (TDLR) in September 2021. The project passed its final TDLR accessibility inspection in July 2026, confirming that the construction phase is finished.

Project Scale and Cost

The estimated cost for the new construction and site work was $75,000,000. This figure translates to $312 per square foot. In comparison to other new construction filings in Fort Bend County, this project’s cost is above the county median for its type, placing it in the top quarter. The scheduled build window of 1,060 days is longer than the county median of 202 days. The $312 per square foot cost is also above the county median of $100.

Corgan served as the design firm of record for the project. The registered accessibility specialist was Kenneth Otten. The project involved public funds and public land. The school district has six other TDLR-registered projects totaling $42,128,000, including facilities in Sugar Land, Fresno, Missouri City, and Houston.

Community and Context

The building is situated in the 77545 ZIP code area. U.S. Census estimates for this ZIP code indicate a population of about 25,863 and a median household income of $91,101. The area has 9,018 housing units with a median owner-occupied home value of $240,100. Housing in this area is predominantly owner-occupied. Fort Bend County’s unemployment rate was 5 percent in July 2026, which is higher than a year earlier.

A Facebook post by the FortBendISD account noted that the district sought name nominations for Middle School 16. Another post by the HuttoISD account also referenced the school naming suggestions for the facility located at 22200 S. Post Oak Blvd. These third-party mentions highlight community engagement in the naming process for the new school building.

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 77545 (Fresno)

One email per change. Unsubscribe in one click. Privacy.

FBISD MIDDLE SCHOOL 16 is a New Construction project located at 22200 S POST OAK BLVD, Fresno, TX 77545 in Fresno, Texas. The project has an estimated value of $75.0M covering 240,000 sq ft. Fort Bend Independent School District is the property owner and Corgan is the design firm of record. The project was registered with TDLR on September 7, 2021.

Frequently Asked Questions

Is the construction complete?

Yes, the building passed its final TDLR accessibility inspection in July 2026, confirming that the physical construction and site work are fully complete.

Who is the owner of the building?

The owner of record for this project is Fort Bend Independent School District, which is responsible for the new construction and site work.

What is the total square footage?

The Fbisd Middle School 16 project covers a total area of 240,000 square feet, as listed in the TDLR registration filing.

Who designed the building?

Corgan is the design firm of record for this project, overseeing the architectural plans for the new school facility.

Is the school open to the public?

The TDLR record confirms construction completion, but does not specify the date the school opened for operations or public access.

What is FBISD MIDDLE SCHOOL 16?

FBISD MIDDLE SCHOOL 16 is a new construction project at 22200 S POST OAK BLVD in Fresno, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Ground up construction and site work.

Is FBISD MIDDLE SCHOOL 16 open in Fresno?

Construction on FBISD MIDDLE SCHOOL 16 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2026. The building is finished and very likely open.

Where is FBISD MIDDLE SCHOOL 16 located?

FBISD MIDDLE SCHOOL 16 is located at 22200 S POST OAK BLVD, Fresno, TX, 77545, in Fort Bend County.

Who is the owner or developer of FBISD MIDDLE SCHOOL 16?

Fort Bend Independent School District is the property owner/developer of record for FBISD MIDDLE SCHOOL 16, per its TDLR project registration.

Who is the architect or design firm for FBISD MIDDLE SCHOOL 16?

Corgan is the design firm of record for FBISD MIDDLE SCHOOL 16, according to its TDLR filing.

How much does FBISD MIDDLE SCHOOL 16 cost and how big is it?

FBISD MIDDLE SCHOOL 16 has an estimated construction value of $75.0M and approximately 240,000 square feet (about $313/sqft), based on its TDLR filing.

Scope of Work

Ground up construction and site work.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

22200 S POST OAK BLVD, Fresno, TX, 77545

Location by street address

Watch all construction in 77545 (Fresno)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.