Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
FM 1867 in Big Wells, TX
From: SH 85 To: 0.752 MI south of SH 85, Big Wells, TX, 78830
FM 1867 is a renovation/alteration project at From: SH 85 To: 0.752 MI south of SH 85, Big Wells, in Dimmit County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Dec 2024 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $253K across about 34,452 sq ft.
- Estimated project value
- $253K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 34,452 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $7/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2y 3mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
347 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
822 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78830 (Big Wells)
One email per change. Unsubscribe in one click. Privacy.
FM 1867 is a Renovation/Alteration project located at From: SH 85 To: 0.752 MI south of SH 85, Big Wells, TX 78830 in Big Wells, Texas. The project has an estimated value of $253K covering 34,452 sq ft. TxDOT District: Laredo is the property owner and PGAL is the design firm of record. The project was registered with TDLR on October 19, 2021.
Frequently Asked Questions
What is FM 1867?
FM 1867 is a renovation/alteration project at From: SH 85 To: 0.752 MI south of SH 85 in Big Wells, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Rehabilitation of existing highway.
Is FM 1867 open in Big Wells?
FM 1867 was scheduled to finish construction in Dec 2024 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is FM 1867 located?
FM 1867 is located at From: SH 85 To: 0.752 MI south of SH 85, Big Wells, TX, 78830, in Dimmit County.
Who is the owner or developer of FM 1867?
TxDOT District: Laredo is the property owner/developer of record for FM 1867, per its TDLR project registration.
Who is the architect or design firm for FM 1867?
PGAL is the design firm of record for FM 1867, according to its TDLR filing.
How much does FM 1867 cost and how big is it?
FM 1867 has an estimated construction value of $253K and approximately 34,452 square feet (about $7/sqft), based on its TDLR filing.
Scope of Work
Rehabilitation of existing highway.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
From: SH 85 To: 0.752 MI south of SH 85, Big Wells, TX, 78830
Related Projects
Same Owner
$37.03B totalWatch all construction in 78830 (Big Wells)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Big Wells?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.