Project intelligenceTDLR TABS2022005356New Construction
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Eagle Mountain High School

Bonds Ranch Road, Fort Worth, TX, 76179

Construction complete · Apr 2024Inspection Complete

Eagle Mountain High School is a new construction project at Bonds Ranch Road, Fort Worth, in Tarrant County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Apr 2024). The project has an estimated value of $200.0M across about 636,878 sq ft.

Estimated project value
$200.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
636,878 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$314/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2y 3mo
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 15, 2021897 days across supplied datesApr 30, 2024

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    78 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Inspection complete · TDLR filing

    The filing records completion of the accessibility inspection.

    819 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Inspection Complete

Final inspection completed, awaiting project closure

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 76179 (Fort Worth)

One email per change. Unsubscribe in one click. Privacy.

Eagle Mountain High School is a New Construction project located at Bonds Ranch Road, Fort Worth, TX 76179 in Fort Worth, Texas. The project has an estimated value of $200.0M covering 636,878 sq ft. Eagle Mountain - Saginaw I.S.D. is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on November 15, 2021.

Frequently Asked Questions

What is Eagle Mountain High School?

Eagle Mountain High School is a new construction project at Bonds Ranch Road in Fort Worth, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: New High School Building and Campus with Athletic Fields and Stadium

Is Eagle Mountain High School open in Fort Worth?

Construction on Eagle Mountain High School is complete — TDLR records show the project passed its required accessibility inspection in Apr 2024. The building is finished and very likely open.

Where is Eagle Mountain High School located?

Eagle Mountain High School is located at Bonds Ranch Road, Fort Worth, TX, 76179, in Tarrant County.

Who is the owner or developer of Eagle Mountain High School?

Eagle Mountain - Saginaw I.S.D. is the property owner/developer of record for Eagle Mountain High School, per its TDLR project registration.

Who is the architect or design firm for Eagle Mountain High School?

VLK Architects Inc is the design firm of record for Eagle Mountain High School, according to its TDLR filing.

How much does Eagle Mountain High School cost and how big is it?

Eagle Mountain High School has an estimated construction value of $200.0M and approximately 636,878 square feet (about $314/sqft), based on its TDLR filing.

Scope of Work

New High School Building and Campus with Athletic Fields and Stadium

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Watch all construction in 76179 (Fort Worth)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Get alerts for Tarrant

Daily email when new projects start nearby.

Start Alerts - $19/mo

Download project data

Get curated lists of projects with full contact info.

Browse Data Lists