Project intelligenceTDLR TABS2022006133Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School in Dallas, TX

2525 Frankford Rd, Dallas, TX, 75287

Construction complete · Aug 2022Project Closed

4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School is a renovation/alteration project at 2525 Frankford Rd, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Aug 2022). The project has an estimated value of $7.0M across about 18,475 sq ft.

Estimated project value
$7.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
18,475 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$379/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Nov 29, 2021258 days across supplied datesAug 14, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    182 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    76 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 75287 (Dallas)

One email per change. Unsubscribe in one click. Privacy.

4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School is a Renovation/Alteration project located at 2525 Frankford Rd, Dallas, TX 75287 in Dallas, Texas. The project has an estimated value of $7.0M covering 18,475 sq ft. CARROLLTON-FARMERS BRANCH ISD is the property owner and VLK Architects Inc is the design firm of record. The project was registered with TDLR on November 29, 2021.

Frequently Asked Questions

What is 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School?

4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School is a renovation/alteration project at 2525 Frankford Rd in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: FINE ARTS, MAKER SPACE UPGRAEDES. MPET AND COURTYARD UPGRADES

Is 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School open in Dallas?

Construction on 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School is complete — TDLR records show the project passed its required accessibility inspection in Aug 2022. The building is finished and very likely open.

Where is 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School located?

4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School is located at 2525 Frankford Rd, Dallas, TX, 75287, in Dallas County.

Who is the owner or developer of 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School?

CARROLLTON-FARMERS BRANCH ISD is the property owner/developer of record for 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School, per its TDLR project registration.

Who is the architect or design firm for 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School?

VLK Architects Inc is the design firm of record for 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School, according to its TDLR filing.

How much does 4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School cost and how big is it?

4 Middle Schools Maintenance Replacement Upgrades – Dan F. Long Middle School has an estimated construction value of $7.0M and approximately 18,475 square feet (about $379/sqft), based on its TDLR filing.

Scope of Work

FINE ARTS, MAKER SPACE UPGRAEDES. MPET AND COURTYARD UPGRADES

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

2525 Frankford Rd, Dallas, TX, 75287

Location by street address

Watch all construction in 75287 (Dallas)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.