Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
FM 3349 at US 79 in Taylor, TX
FM 3349 from north of CR 404 to CR 395, Taylor, TX, 76574
FM 3349 at US 79 is a new construction project at FM 3349 from north of CR 404 to CR 395, Taylor, in Williamson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $50.5M across about 38,899 sq ft.
- Estimated project value
- $50.5M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 38,899 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $1.30K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 11mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
32 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
700 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76574 (Taylor)
One email per change. Unsubscribe in one click. Privacy.
FM 3349 at US 79 is a New Construction project located at FM 3349 from north of CR 404 to CR 395, Taylor, TX 76574 in Taylor, Texas. The project has an estimated value of $50.5M covering 38,899 sq ft. Williamson County is the property owner and HDR Engineering, Inc. is the design firm of record. The project was registered with TDLR on December 2, 2021.
Frequently Asked Questions
What is FM 3349 at US 79?
FM 3349 at US 79 is a new construction project at FM 3349 from north of CR 404 to CR 395 in Taylor, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Construction of a two lane divided roadway consisting of grading, flex base, asphalt pavement, retaining walls, bridge structures, storm sewers, culverts, erosion control, signing, and pavement markings.
Is FM 3349 at US 79 open in Taylor?
Construction on FM 3349 at US 79 is complete — TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is FM 3349 at US 79 located?
FM 3349 at US 79 is located at FM 3349 from north of CR 404 to CR 395, Taylor, TX, 76574, in Williamson County.
Who is the owner or developer of FM 3349 at US 79?
Williamson County is the property owner/developer of record for FM 3349 at US 79, per its TDLR project registration.
Who is the architect or design firm for FM 3349 at US 79?
HDR Engineering, Inc. is the design firm of record for FM 3349 at US 79, according to its TDLR filing.
How much does FM 3349 at US 79 cost and how big is it?
FM 3349 at US 79 has an estimated construction value of $50.5M and approximately 38,899 square feet (about $1.30K/sqft), based on its TDLR filing.
Scope of Work
Construction of a two lane divided roadway consisting of grading, flex base, asphalt pavement, retaining walls, bridge structures, storm sewers, culverts, erosion control, signing, and pavement markings.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
FM 3349 from north of CR 404 to CR 395, Taylor, TX, 76574
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$354.6M totalWatch all construction in 76574 (Taylor)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Taylor?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.