Project intelligenceTDLR TABS2022008127Additions to Existing Building
Funding type

This project is privately funded, on private land for private use.

F45 Headquarters Level 1 in Austin, TX

3601 S Congress Bldg E, Austin, TX, 78704

Target date passed (May 2022)Review Complete

F45 Headquarters Level 1 is a additions to existing building project at 3601 S Congress Bldg E, Austin, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish May 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $4.0M across about 20,000 sq ft.

Estimated project value
$4.0M
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
20,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$200/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
4 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Dec 22, 2021138 days across supplied datesMay 9, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    33 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    105 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78704 (Austin)

One email per change. Unsubscribe in one click. Privacy.

F45 Headquarters Level 1 is a Additions to Existing Building project located at 3601 S Congress Bldg E, Austin, TX 78704 in Austin, Texas. The project has an estimated value of $4.0M covering 20,000 sq ft. CIM Group is the property owner and Sixthriver is the design firm of record. The project was registered with TDLR on December 22, 2021.

Frequently Asked Questions

What is F45 Headquarters Level 1?

F45 Headquarters Level 1 is a additions to existing building project at 3601 S Congress Bldg E in Austin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Interior finish out of an existing 1st generation shell building

Is F45 Headquarters Level 1 open in Austin?

F45 Headquarters Level 1 was scheduled to finish construction in May 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is F45 Headquarters Level 1 located?

F45 Headquarters Level 1 is located at 3601 S Congress Bldg E, Austin, TX, 78704, in Travis County.

Who is the owner or developer of F45 Headquarters Level 1?

CIM Group is the property owner/developer of record for F45 Headquarters Level 1, per its TDLR project registration.

Who is the architect or design firm for F45 Headquarters Level 1?

Sixthriver is the design firm of record for F45 Headquarters Level 1, according to its TDLR filing.

How much does F45 Headquarters Level 1 cost and how big is it?

F45 Headquarters Level 1 has an estimated construction value of $4.0M and approximately 20,000 square feet (about $200/sqft), based on its TDLR filing.

Scope of Work

Interior finish out of an existing 1st generation shell building

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

3601 S Congress Bldg E, Austin, TX, 78704

Explore the supplied address

A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.

Location by street address

Related City Permits

Building permits found at or near this location

3601 S CONGRESS AVE BLDG I UNIT 100

Interior remodel of existing office spaces.

ActiveElectrical PermitRemodelNov 2026
View Details
2026-131191 EP
Palomino Electric
3601 MALONE DR

BASE: Installing a backup battery system and additional meter socket.

ActiveElectrical PermitAuxiliary PowerOct 2026
View Details
2026-138339 EP
Base Power
3601 FAR VIEW DR

Replacement of complete existing central heat and air system with or without duct work 2 Ton Dual Fuel 18.25 SEER2 HVAC system replacement

ActiveMechanical PermitChange OutOct 2026
View Details
2026-138937 MP
Team Enoch
3601 EDGEMONT DR

REPLACE DCA BACKFLOW DEVICE ONLY NOT AN IRRIGATION INSTALLATION

ActivePlumbing PermitIrrigationOct 2026
View Details
2026-137668 PP
3601 W WILLIAM CANNON DR

Install one illuminated wall sign for HARBOR HEALTH

ActiveElectrical PermitWallOct 2026
View Details
2026-138328 EP
CND Signs, LLC

Watch all construction in 78704 (Austin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.