Funding type
This project is privately funded, on private land for private use.
Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress
100 Research Parkway, Waco, TX, 76704
Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress is a renovation/alteration project at 100 Research Parkway, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2022). The project has an estimated value of $2.0M across about 15,889 sq ft.
- Estimated project value
- $2.0M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 15,889 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $126/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 5 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
148 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76704 (Waco)
One email per change. Unsubscribe in one click. Privacy.
Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress is a Renovation/Alteration project located at 100 Research Parkway, Waco, TX 76704 in Waco, Texas. The project has an estimated value of $2.0M covering 15,889 sq ft. Baylor University is the property owner and RBDR, PLLC is the design firm of record. The project was registered with TDLR on February 2, 2022.
Frequently Asked Questions
What is Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress?
Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress is a renovation/alteration project at 100 Research Parkway in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Subdividing the existing shell space with egress corridors on three floors. A new 3800 SF Mechanical Engineering Research Suite will be built out of the existing space. The suite includes office space and research laboratories.
Is Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress open in Waco?
Construction on Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress is complete — TDLR records show the project passed its required accessibility inspection in Jun 2022. The building is finished and very likely open.
Where is Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress located?
Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress is located at 100 Research Parkway, Waco, TX, 76704, in McLennan County.
Who is the owner or developer of Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress?
Baylor University is the property owner/developer of record for Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress, per its TDLR project registration.
Who is the architect or design firm for Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress?
RBDR, PLLC is the design firm of record for Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress, according to its TDLR filing.
How much does Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress cost and how big is it?
Baylor University BRIC 2nd Floor - West Wing Materials Engineering Labs & Egress has an estimated construction value of $2.0M and approximately 15,889 square feet (about $126/sqft), based on its TDLR filing.
Scope of Work
Subdividing the existing shell space with egress corridors on three floors. A new 3800 SF Mechanical Engineering Research Suite will be built out of the existing space. The suite includes office space and research laboratories.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
100 Research Parkway, Waco, TX, 76704
Related Projects
Same Owner
$863.2M totalNearby Projects
Within 1 kmWatch all construction in 76704 (Waco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.