Funding type
This project is privately funded, on private land for private use.
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission
1214 S 4th St, Waco, TX, 76706
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission is a renovation/alteration project at 1214 S 4th St, Waco, in McLennan County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Under construction, estimated completion Dec 2026. The project has an estimated value of $100K across about 225 sq ft.
- Estimated project value
- $100K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 225 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $444/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 3 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
3 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
9 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
91 days after the preceding date shown.
Source: TDLR filing
View source record
📰About Baylor- Marrs McLean Science Bldg- Stair Tower Decommission
Baylor University is removing an existing stair tower from the Marrs McLean Science Building at 1214 S 4th St in Waco. This renovation project involves the demolition of approximately 225 square feet of structure, a specific scope of work filed under the name Baylor- Marrs McLean Science Bldg- Stair Tower Decommission. The estimated cost for this alteration is $100,000, which translates to a cost of $444 per square foot.
The project is registered with TDLR and is in the plan review stage. Construction is scheduled to begin in October 2026, with the entire process targeted for December 2026. This timeline represents a scheduled build window of 91 days, which is shorter than the 122-day median for similar renovation projects in McLennan County. The status of the filing is Project Registered, indicating that the administrative steps are underway before physical work commences.
Project Details and Context
Rbdr, PLLC serves as the design firm of record for this work. The registered accessibility specialist listed on the filing is Michael Lynn Kelley. The project is privately funded and located on private land for private use. While the total estimated cost is below the county median of $277,446 for renovation and alteration filings, the per-square-foot cost is above the county median of $96. This reflects the intensive nature of removing a structural element like a stair tower compared to broader interior renovations.
Baylor University has six other TDLR-registered projects, totaling over $10.6 million, including the Bear Habitat and the Truett Theological Seminary. Rbdr, PLLC has also been involved in several other projects, such as the City of Waxahachie Fire Rescue Station No. 1 and Alamo Steel. The Marrs McLean Science Building is situated in the 76706 ZIP code, a area with a population of about 40,668 people and a median household income of $42,277 according to U.S. Census estimates. The local housing market in this ZIP code is mostly renter-occupied, with a median owner-occupied home value of $180,600.
The removal of the stair tower is a focused alteration rather than a new construction effort. The 225 square feet of space being removed is a small fraction of the overall building footprint, but the work requires specific engineering and safety considerations. The project’s registration in September 2026 marks the formal start of the compliance process. With a completion date set for late 2026, the work is expected to be relatively quick once construction begins. The low total cost compared to other university projects suggests this is a discrete maintenance or modification task rather than a major expansion.
Project Registered
Project has been registered with TDLR and is in pre-construction phase
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76706 (Waco)
One email per change. Unsubscribe in one click. Privacy.
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission is a Renovation/Alteration project located at 1214 S 4th St, Waco, TX 76706 in Waco, Texas. The project has an estimated value of $100K covering 225 sq ft. Baylor University is the property owner and RBDR, PLLC is the design firm of record. The project was registered with TDLR on September 22, 2026.
Frequently Asked Questions
What is the scope of work for this project?
The scope involves the removal of an existing stair tower totaling approximately 225 square feet. This is a renovation and alteration project focused on decommissioning that specific structure within the science building.
Who is the owner and design firm?
Baylor University is the owner of record. Rbdr, PLLC is the design firm of record. Michael Lynn Kelley is the registered accessibility specialist listed for the project.
What is the estimated cost?
The estimated cost is $100,000. This equates to $444 per square foot for the 225 square feet of work. This figure is below the county median for similar projects.
When is the project expected to be completed?
Construction is scheduled to start in October 2026. The project is targeted for December 2026, giving a total build window of 91 days from start to finish.
Is the building open to the public?
The TDLR record covers construction status only. It does not provide information on public access or business operations. The project is a renovation in progress, not a new opening.
What is Baylor- Marrs McLean Science Bldg- Stair Tower Decommission?
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission is a renovation/alteration project at 1214 S 4th St in Waco, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal of existing stair tower totaling approximately 225 square feet.
Is Baylor- Marrs McLean Science Bldg- Stair Tower Decommission open in Waco?
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission is still under construction in Waco, TX, with an estimated completion of Dec 2026 according to its TDLR registration.
Where is Baylor- Marrs McLean Science Bldg- Stair Tower Decommission located?
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission is located at 1214 S 4th St, Waco, TX, 76706, in McLennan County.
Who is the owner or developer of Baylor- Marrs McLean Science Bldg- Stair Tower Decommission?
Baylor University is the property owner/developer of record for Baylor- Marrs McLean Science Bldg- Stair Tower Decommission, per its TDLR project registration.
Who is the architect or design firm for Baylor- Marrs McLean Science Bldg- Stair Tower Decommission?
RBDR, PLLC is the design firm of record for Baylor- Marrs McLean Science Bldg- Stair Tower Decommission, according to its TDLR filing.
How much does Baylor- Marrs McLean Science Bldg- Stair Tower Decommission cost and how big is it?
Baylor- Marrs McLean Science Bldg- Stair Tower Decommission has an estimated construction value of $100K and approximately 225 square feet (about $444/sqft), based on its TDLR filing.
Scope of Work
Removal of existing stair tower totaling approximately 225 square feet.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
1214 S 4th St, Waco, TX, 76706
Related Projects
Same Owner
$4.5M totalWatch all construction in 76706 (Waco)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Waco?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.