Project intelligenceTDLR TABS2022013149Renovation/Alteration
Funding type

This project involves public funds, public land, or is a Federally funded roadway project.

Lifecycle Curb and Gutter Replacement Delivery Order #1

Park Avenue (Staples to Shoreline) Coleman Avenue (Staples to Upper Broadway), Corpus Christi, TX, 78401

Construction complete · May 2022Project Closed

Lifecycle Curb and Gutter Replacement Delivery Order #1 is a renovation/alteration project at Park Avenue (Staples to Shoreline) Coleman Avenue (Staples to Upper Broadway), Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed May 2022). The project has an estimated value of $500K across about 40,000 sq ft.

Estimated project value
$500K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
40,000 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$13/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
2 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Mar 3, 202278 days across supplied datesMay 20, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    18 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    60 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78401 (Corpus Christi)

One email per change. Unsubscribe in one click. Privacy.

Lifecycle Curb and Gutter Replacement Delivery Order #1 is a Renovation/Alteration project located at Park Avenue (Staples to Shoreline) Coleman Avenue (Staples to Upper Broadway), Corpus Christi, TX 78401 in Corpus Christi, Texas. The project has an estimated value of $500K covering 40,000 sq ft. City of Corpus Christi is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on March 3, 2022.

Frequently Asked Questions

What is Lifecycle Curb and Gutter Replacement Delivery Order #1?

Lifecycle Curb and Gutter Replacement Delivery Order #1 is a renovation/alteration project at Park Avenue (Staples to Shoreline) Coleman Avenue (Staples to Upper Broadway) in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Replacement of curb and gutter, sidewalk, driveways, and curb ramps

Is Lifecycle Curb and Gutter Replacement Delivery Order #1 open in Corpus Christi?

Construction on Lifecycle Curb and Gutter Replacement Delivery Order #1 is complete — TDLR records show the project passed its required accessibility inspection in May 2022. The building is finished and very likely open.

Where is Lifecycle Curb and Gutter Replacement Delivery Order #1 located?

Lifecycle Curb and Gutter Replacement Delivery Order #1 is located at Park Avenue (Staples to Shoreline) Coleman Avenue (Staples to Upper Broadway), Corpus Christi, TX, 78401, in Nueces County.

Who is the owner or developer of Lifecycle Curb and Gutter Replacement Delivery Order #1?

City of Corpus Christi is the property owner/developer of record for Lifecycle Curb and Gutter Replacement Delivery Order #1, per its TDLR project registration.

Who is the architect or design firm for Lifecycle Curb and Gutter Replacement Delivery Order #1?

Freese and Nichols, Inc. is the design firm of record for Lifecycle Curb and Gutter Replacement Delivery Order #1, according to its TDLR filing.

How much does Lifecycle Curb and Gutter Replacement Delivery Order #1 cost and how big is it?

Lifecycle Curb and Gutter Replacement Delivery Order #1 has an estimated construction value of $500K and approximately 40,000 square feet (about $13/sqft), based on its TDLR filing.

Scope of Work

Replacement of curb and gutter, sidewalk, driveways, and curb ramps

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Park Avenue (Staples to Shoreline) Coleman Avenue (Staples to Upper Broadway), Corpus Christi, TX, 78401

Location by street address

Watch all construction in 78401 (Corpus Christi)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in Corpus Christi?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.