Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1
Monitor Street, Corpus Christi, TX, 78415
Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 is a renovation/alteration project at Monitor Street, Corpus Christi, in Nueces County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jun 2022). The project has an estimated value of $433K across about 10,569 sq ft.
- Estimated project value
- $433K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 10,569 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $41/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
14 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
61 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78415 (Corpus Christi)
One email per change. Unsubscribe in one click. Privacy.
Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 is a Renovation/Alteration project located at Monitor Street, Corpus Christi, TX 78415 in Corpus Christi, Texas. The project has an estimated value of $433K covering 10,569 sq ft. City of Corpus Christi is the property owner and Freese and Nichols, Inc. is the design firm of record. The project was registered with TDLR on April 4, 2022.
Frequently Asked Questions
What is Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1?
Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 is a renovation/alteration project at Monitor Street in Corpus Christi, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removal and replacement of Curb and Gutter, Driveways, Sidewalks, and Curb Ramps.
Is Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 open in Corpus Christi?
Construction on Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 is complete — TDLR records show the project passed its required accessibility inspection in Jun 2022. The building is finished and very likely open.
Where is Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 located?
Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 is located at Monitor Street, Corpus Christi, TX, 78415, in Nueces County.
Who is the owner or developer of Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1?
City of Corpus Christi is the property owner/developer of record for Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1, per its TDLR project registration.
Who is the architect or design firm for Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1?
Freese and Nichols, Inc. is the design firm of record for Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1, according to its TDLR filing.
How much does Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 cost and how big is it?
Lifecycle Curb and Gutter Replacement/Residential Street Rebuild DO A-1 has an estimated construction value of $433K and approximately 10,569 square feet (about $41/sqft), based on its TDLR filing.
Scope of Work
Removal and replacement of Curb and Gutter, Driveways, Sidewalks, and Curb Ramps.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
Monitor Street, Corpus Christi, TX, 78415
Related Projects
Same Owner
$696.5M totalWatch all construction in 78415 (Corpus Christi)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Corpus Christi?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.