Project intelligenceTDLR TABS2022016431New Construction
Funding type

This project is privately funded, on private land for private use.

Trinity Ranch Phase 1-2

Swenson Blvd., Elgin, TX, 78621

Target date passed (Jan 2023)Review Complete

Trinity Ranch Phase 1-2 is a new construction project at Swenson Blvd., Elgin, in Bastrop County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Jan 2023 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $237K across about 1,655,280 sq ft.

Estimated project value
$237K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
1,655,280 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$0/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
3 months
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

Apr 12, 2022294 days across supplied datesJan 31, 2023

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Review complete · TDLR filing

    The filing records completion of the accessibility review.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record
  3. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    203 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    91 days after the preceding date shown.

    Source: TDLR filing

    View source record

Review Complete

Design review complete, construction may proceed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78621 (Elgin)

One email per change. Unsubscribe in one click. Privacy.

Trinity Ranch Phase 1-2 is a New Construction project located at Swenson Blvd., Elgin, TX 78621 in Elgin, Texas. The project has an estimated value of $237K covering 1,655,280 sq ft. Century Land Holdings II, LLC is the property owner and BGE, Inc. is the design firm of record. The project was registered with TDLR on April 12, 2022.

Frequently Asked Questions

What is Trinity Ranch Phase 1-2?

Trinity Ranch Phase 1-2 is a new construction project at Swenson Blvd. in Elgin, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalks and ramps for residential subdivision.

Is Trinity Ranch Phase 1-2 open in Elgin?

Trinity Ranch Phase 1-2 was scheduled to finish construction in Jan 2023 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.

Where is Trinity Ranch Phase 1-2 located?

Trinity Ranch Phase 1-2 is located at Swenson Blvd., Elgin, TX, 78621, in Bastrop County.

Who is the owner or developer of Trinity Ranch Phase 1-2?

Century Land Holdings II, LLC is the property owner/developer of record for Trinity Ranch Phase 1-2, per its TDLR project registration.

Who is the architect or design firm for Trinity Ranch Phase 1-2?

BGE, Inc. is the design firm of record for Trinity Ranch Phase 1-2, according to its TDLR filing.

How much does Trinity Ranch Phase 1-2 cost and how big is it?

Trinity Ranch Phase 1-2 has an estimated construction value of $237K and approximately 1,655,280 square feet (about $0/sqft), based on its TDLR filing.

Scope of Work

Sidewalks and ramps for residential subdivision.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Swenson Blvd., Elgin, TX, 78621

30.34192, -97.38050

Watch all construction in 78621 (Elgin)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.