IH 35W at Bus 35W
CR 604/CR 707 to US 67, Alvarado, TX, 76009
IH 35W at Bus 35W is a new construction project at CR 604/CR 707 to US 67, Alvarado, in Johnson County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Dec 2023). The project has an estimated value of $10.1M across about 1,000 sq ft.
- Estimated project value
- $10.1M
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 1,000 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $10.10K/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 1y 2mo
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
197 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
424 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 76009 (Alvarado)
One email per change. Unsubscribe in one click. Privacy.
IH 35W at Bus 35W is a New Construction project located at CR 604/CR 707 to US 67, Alvarado, TX 76009 in Alvarado, Texas. The project has an estimated value of $10.1M covering 1,000 sq ft. TxDOT District: Fort Worth is the property owner and AECOM is the design firm of record. The project was registered with TDLR on April 18, 2022.
Frequently Asked Questions
What is IH 35W at Bus 35W?
IH 35W at Bus 35W is a new construction project at CR 604/CR 707 to US 67 in Alvarado, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Constr. of new FR on IH 35W NB, entrance and exit ramps relocation on the IH 35W NBML, realignment of BUS 35W route to a "T" inter with the new IH 35W NBFR, realignment and constr of IH 35W NBML north of US 67 to make them concentric to…
Is IH 35W at Bus 35W open in Alvarado?
Construction on IH 35W at Bus 35W is complete — TDLR records show the project passed its required accessibility inspection in Dec 2023. The building is finished and very likely open.
Where is IH 35W at Bus 35W located?
IH 35W at Bus 35W is located at CR 604/CR 707 to US 67, Alvarado, TX, 76009, in Johnson County.
Who is the owner or developer of IH 35W at Bus 35W?
TxDOT District: Fort Worth is the property owner/developer of record for IH 35W at Bus 35W, per its TDLR project registration.
Who is the architect or design firm for IH 35W at Bus 35W?
AECOM is the design firm of record for IH 35W at Bus 35W, according to its TDLR filing.
How much does IH 35W at Bus 35W cost and how big is it?
IH 35W at Bus 35W has an estimated construction value of $10.1M and approximately 1,000 square feet (about $10.10K/sqft), based on its TDLR filing.
Scope of Work
Constr. of new FR on IH 35W NB, entrance and exit ramps relocation on the IH 35W NBML, realignment of BUS 35W route to a "T" inter with the new IH 35W NBFR, realignment and constr of IH 35W NBML north of US 67 to make them concentric to IH 35W SBM
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Related Projects
Same Owner
$37.03B totalWatch all construction in 76009 (Alvarado)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.