Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
Del Valle High School Reception Renovation
5201 Ross Rd, Del Valle, TX, 78613
Del Valle High School Reception Renovation is a renovation/alteration project at 5201 Ross Rd, Del Valle, in Travis County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Scheduled to finish Aug 2022 per its TDLR filing; no final inspection recorded yet. The project has an estimated value of $444K across about 890 sq ft.
- Estimated project value
- $444K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 890 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $499/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 2 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Project registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
Source: TDLR filing
View source recordReview complete · TDLR filing
The filing records completion of the accessibility review.
Same day as the preceding date shown.
Source: TDLR filing
View source recordScheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
37 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
61 days after the preceding date shown.
Source: TDLR filing
View source record
Review Complete
Design review complete, construction may proceed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 78613 (Del Valle)
One email per change. Unsubscribe in one click. Privacy.
Del Valle High School Reception Renovation is a Renovation/Alteration project located at 5201 Ross Rd, Del Valle, TX 78613 in Del Valle, Texas. The project has an estimated value of $444K covering 890 sq ft. Del Valle Independent School District is the property owner and Stantec is the design firm of record. The project was registered with TDLR on April 25, 2022.
Frequently Asked Questions
What is Del Valle High School Reception Renovation?
Del Valle High School Reception Renovation is a renovation/alteration project at 5201 Ross Rd in Del Valle, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Renovation of an existing reception entry lobby.
Is Del Valle High School Reception Renovation open in Del Valle?
Del Valle High School Reception Renovation was scheduled to finish construction in Aug 2022 according to its TDLR registration, but TDLR has not recorded a final accessibility inspection, so its opening status is not confirmed in the public record.
Where is Del Valle High School Reception Renovation located?
Del Valle High School Reception Renovation is located at 5201 Ross Rd, Del Valle, TX, 78613, in Travis County.
Who is the owner or developer of Del Valle High School Reception Renovation?
Del Valle Independent School District is the property owner/developer of record for Del Valle High School Reception Renovation, per its TDLR project registration.
Who is the architect or design firm for Del Valle High School Reception Renovation?
Stantec is the design firm of record for Del Valle High School Reception Renovation, according to its TDLR filing.
How much does Del Valle High School Reception Renovation cost and how big is it?
Del Valle High School Reception Renovation has an estimated construction value of $444K and approximately 890 square feet (about $499/sqft), based on its TDLR filing.
Scope of Work
Renovation of an existing reception entry lobby.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
5201 Ross Rd, Del Valle, TX, 78613
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$493.5M totalRelated City Permits
Building permits found at or near this location
Replacement of complete existing central heat and air system with or without duct work
Installation of two (2) light posts for security lighting around the playground in the park. 2026-038815 DA.
Installation of two (2) light posts for security lighting around the playground in the park. 2026-038815 DA.
Replacement of an existing water heater
ETJ - 200amp panel replacement *Has AE- Disconnect and Reconnect only*
Watch all construction in 78613 (Del Valle)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Del Valle?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.