Spec Suite 430
Spec Suite 430 is a renovation/alteration project at 3838 Oak Lawn Ave. Suite 430, Dallas, in Dallas County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Currently under construction. The project has an estimated value of $110K across about 1,214 sq ft.
๐Project Metrics
TDLR #TABS2022019565Project Registered
Project has been registered with TDLR and is in pre-construction phase
Spec Suite 430 is a Renovation/Alteration project located at 3838 Oak Lawn Ave. Suite 430, Dallas, TX 75219 in Dallas, Texas. The project has an estimated value of $110K covering 1,214 sq ft. CIM Group is the property owner and Entos Design is the design firm of record. The project was registered with TDLR on May 20, 2022.
โFrequently Asked Questions
What is Spec Suite 430?
Spec Suite 430 is a renovation/alteration project at 3838 Oak Lawn Ave. Suite 430 in Dallas, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Tenant finish out, remodel
Is Spec Suite 430 open in Dallas?
Spec Suite 430 is currently under construction in Dallas, TX. Its current TDLR status is "Project Registered".
Where is Spec Suite 430 located?
Spec Suite 430 is located at 3838 Oak Lawn Ave. Suite 430, Dallas, TX, 75219, in Dallas County.
Who is the owner or developer of Spec Suite 430?
CIM Group is the property owner/developer of record for Spec Suite 430, per its TDLR project registration.
Who is the architect or design firm for Spec Suite 430?
Entos Design is the design firm of record for Spec Suite 430, according to its TDLR filing.
How much does Spec Suite 430 cost and how big is it?
Spec Suite 430 has an estimated construction value of $110K and approximately 1,214 square feet (about $91/sqft), based on its TDLR filing.
๐Scope of Work
Tenant finish out, remodel
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
๐ Compliance Timeline
๐ Project Timeline
Filed
May 20, 2022
Review Complete
Inspection Complete
Closed