Project intelligenceTDLR TABS2022019636New Construction
Funding type

This project is privately funded, on private land for private use.

La Cima Phase 4

Central Park Loop, San Marcos, TX, 78666

Construction complete · Jul 2022Project Closed

La Cima Phase 4 is a new construction project at Central Park Loop, San Marcos, in Hays County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Jul 2022). The project has an estimated value of $126K across about 15,722 sq ft.

Estimated project value
$126K
About this figure

Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.

Reported floor area
15,722 ft²
About this figure

Square footage reported for this scope of work. It may cover only part of a larger property.

Estimated cost / ft²
$8/sqft
About this figure

Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.

Scheduled duration
26 days
About this figure

The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.

The project record

Project timeline

Explore filed milestones and scheduled dates. Open a milestone for its source.

May 21, 202271 days across supplied datesJul 31, 2022

4 timeline dates shown.

  1. Project registered · TDLR filing

    Registration of the project with the Texas Department of Licensing and Regulation.

    Source: TDLR filing

    View source record
  2. Scheduled construction start · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    45 days after the preceding date shown.

    Source: TDLR filing

    View source record
  3. Project closed · TDLR filing

    The project record was closed in TDLR.

    26 days after the preceding date shown.

    Source: TDLR filing

    View source record
  4. Scheduled completion · Scheduled date

    A date supplied in the filing; this does not confirm that work started or finished.

    Same day as the preceding date shown.

    Source: TDLR filing

    View source record

Project Closed

Project has been completed and closed

Follow this project

Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.

Or watch all projects in 78666 (San Marcos)

One email per change. Unsubscribe in one click. Privacy.

La Cima Phase 4 is a New Construction project located at Central Park Loop, San Marcos, TX 78666 in San Marcos, Texas. The project has an estimated value of $126K covering 15,722 sq ft. LCSM PH 4, LLC is the property owner and Bowman Engineering is the design firm of record. The project was registered with TDLR on May 21, 2022.

Frequently Asked Questions

What is La Cima Phase 4?

La Cima Phase 4 is a new construction project at Central Park Loop in San Marcos, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Sidewalk and curb ramps in public ROW built with private funds as part of single family residential subdivision.

Is La Cima Phase 4 open in San Marcos?

Construction on La Cima Phase 4 is complete — TDLR records show the project passed its required accessibility inspection in Jul 2022. The building is finished and very likely open.

Where is La Cima Phase 4 located?

La Cima Phase 4 is located at Central Park Loop, San Marcos, TX, 78666, in Hays County.

Who is the owner or developer of La Cima Phase 4?

LCSM PH 4, LLC is the property owner/developer of record for La Cima Phase 4, per its TDLR project registration.

Who is the architect or design firm for La Cima Phase 4?

Bowman Engineering is the design firm of record for La Cima Phase 4, according to its TDLR filing.

How much does La Cima Phase 4 cost and how big is it?

La Cima Phase 4 has an estimated construction value of $126K and approximately 15,722 square feet (about $8/sqft), based on its TDLR filing.

Scope of Work

Sidewalk and curb ramps in public ROW built with private funds as part of single family residential subdivision.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

Location & views

Central Park Loop, San Marcos, TX, 78666

Location by street address

Watch all construction in 78666 (San Marcos)

A short email when anything new is filed in this ZIP. One ZIP free, weekly.

Unsubscribe in one click. Privacy.

Keep exploring

What else is changing in San Marcos?

See the surrounding filings, compare the reported schedules, and follow the places that matter to you.