Funding type
This project involves public funds, public land, or is a Federally funded roadway project.
CLCWA Meadowgreen Section 1 Drainage Improvements in Houston, TX
15410 Peermont Street, Houston, TX, 77062
CLCWA Meadowgreen Section 1 Drainage Improvements is a renovation/alteration project at 15410 Peermont Street, Houston, in Harris County, TX, tracked from its Texas Department of Licensing and Regulation (TDLR) registration. Construction complete (TDLR inspection passed Sep 2022). The project has an estimated value of $130K across about 5,674 sq ft.
- Estimated project value
- $130K
About this figure
Estimated construction cost supplied in the TDLR filing. This is not a current property appraisal or a final construction invoice.
- Reported floor area
- 5,674 ft²
About this figure
Square footage reported for this scope of work. It may cover only part of a larger property.
- Estimated cost / ft²
- $23/sqft
About this figure
Calculated from this filing’s estimated cost divided by its reported square footage. Available only when both figures are supplied; it is not a market benchmark.
- Scheduled duration
- 4 months
About this figure
The interval between the filed start and completion dates. These dates describe the proposed schedule and do not measure actual construction progress.
The project record
Project timeline
Explore filed milestones and scheduled dates. Open a milestone for its source.
4 timeline dates shown.
Scheduled construction start · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Source: TDLR filing
View source recordProject registered · TDLR filing
Registration of the project with the Texas Department of Licensing and Regulation.
2 days after the preceding date shown.
Source: TDLR filing
View source recordProject closed · TDLR filing
The project record was closed in TDLR.
113 days after the preceding date shown.
Source: TDLR filing
View source recordScheduled completion · Scheduled date
A date supplied in the filing; this does not confirm that work started or finished.
Same day as the preceding date shown.
Source: TDLR filing
View source record
Project Closed
Project has been completed and closed
Follow this project
Get an email when the status changes — permits pulled, construction started, work finished. Free, and nothing else.
Or watch all projects in 77062 (Houston)
One email per change. Unsubscribe in one click. Privacy.
CLCWA Meadowgreen Section 1 Drainage Improvements is a Renovation/Alteration project located at 15410 Peermont Street, Houston, TX 77062 in Houston, Texas. The project has an estimated value of $130K covering 5,674 sq ft. Clear Lake City Water Authority is the property owner and Lockwood, Andrews, & Newnam, Inc. is the design firm of record. The project was registered with TDLR on May 25, 2022.
Frequently Asked Questions
What is CLCWA Meadowgreen Section 1 Drainage Improvements?
CLCWA Meadowgreen Section 1 Drainage Improvements is a renovation/alteration project at 15410 Peermont Street in Houston, Texas, registered with the Texas Department of Licensing and Regulation (TDLR). Scope of work: Removing and replacing sidewalk due to storm sewer installation.
Is CLCWA Meadowgreen Section 1 Drainage Improvements open in Houston?
Construction on CLCWA Meadowgreen Section 1 Drainage Improvements is complete — TDLR records show the project passed its required accessibility inspection in Sep 2022. The building is finished and very likely open.
Where is CLCWA Meadowgreen Section 1 Drainage Improvements located?
CLCWA Meadowgreen Section 1 Drainage Improvements is located at 15410 Peermont Street, Houston, TX, 77062, in Harris County.
Who is the owner or developer of CLCWA Meadowgreen Section 1 Drainage Improvements?
Clear Lake City Water Authority is the property owner/developer of record for CLCWA Meadowgreen Section 1 Drainage Improvements, per its TDLR project registration.
Who is the architect or design firm for CLCWA Meadowgreen Section 1 Drainage Improvements?
Lockwood, Andrews, & Newnam, Inc. is the design firm of record for CLCWA Meadowgreen Section 1 Drainage Improvements, according to its TDLR filing.
How much does CLCWA Meadowgreen Section 1 Drainage Improvements cost and how big is it?
CLCWA Meadowgreen Section 1 Drainage Improvements has an estimated construction value of $130K and approximately 5,674 square feet (about $23/sqft), based on its TDLR filing.
Scope of Work
Removing and replacing sidewalk due to storm sewer installation.
Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.
Location & views
15410 Peermont Street, Houston, TX, 77062
Explore the supplied address
A precise map point has not been loaded. Choose to look up the address, or open it in Google Maps using the link below.
Related Projects
Same Owner
$23.9M totalSame Design Firm
$2.38B totalWatch all construction in 77062 (Houston)
A short email when anything new is filed in this ZIP. One ZIP free, weekly.
Unsubscribe in one click. Privacy.
Keep exploring
What else is changing in Houston?
See the surrounding filings, compare the reported schedules, and follow the places that matter to you.