๐ŸProject Closed๐Ÿ—๏ธ New Construction๐Ÿ’ต This project is privately funded, on private land for private use.

TX-UC Hutto

440 Chris Kelly Blvd., Hutto, TX 78634, Hutto, TX, 78634
Completed100%

๐Ÿ“ŠProject Metrics

TDLR #TABS2022025417
$750K
Project Value
3,005
Square Feet
$250/sqft
Cost/SqFt
2 months
Duration
Registered:Aug 4, 2022
Start:Aug 22, 2022
Target:Oct 31, 2022
๐Ÿ

Project Closed

Project has been completed and closed

๐Ÿ“‹Scope of Work

New construction of an Urgent Care Clinic of approximately 3,000 SF. Included will be lobby, accessible restrooms, exam rooms and lab area. Also included will be site improvements such as Parking, Drives and Sidewalks.

Note: This project is registered under the Texas Accessibility Standards (TAS) program. TDLR registration is required for commercial and public facility construction to ensure compliance with accessibility requirements under Texas Government Code Chapter 469.

๐Ÿ“…Compliance Timeline

Project Registered
August 4, 2022
Construction Start
August 22, 2022
Expected Completion
October 31, 2022

๐Ÿ“„Related City Permits

Building permits found at or near this location

4408 LONG CHAMP DR BLDG CLUB

Replace the existing main electrical switchgear with new and install a building backup generator and ATS.

ActiveBuilding PermitRemodelDec 2025
View Details
2025-160909 BP
๐Ÿ”งMechanical Technical Services, Inc.
4408 LONG CHAMP DR BLDG CLUB

Replace the existing main electrical switchgear with new and install a building backup generator and ATS.

ActiveElectrical PermitRemodelDec 2025
View Details
2025-160909 EP
๐Ÿ”งMechanical Technical Services
4402 S CONGRESS AVE

Includes reorganization of existing kitchen equipment and addition of new fryer units. The existing type 1 hood and wrapped ducts will be replaced with Type 1 new equipment. Rooftop equipment will remain existing.

ActiveBuilding PermitRemodelDec 2025
View Details
2025-154596 BP
๐Ÿ”งTri-Covenant Construction
4402 AVENUE D

lowering gas line-natural gas **Lower the flex gas line to underneath the floor and run solid steel piping down to the floor for a proper SAFE connection. After running the new black pipe the system was aired to 3lb of Pressure and a micro leak is present. 1lb every 12-15min.

ActivePlumbing PermitRepairDec 2025
View Details
2025-159590 PP
๐Ÿ”งPlumbing Outfitters LLC
4400 S IH 35 SVRD SB

Repair gas line and perform gas test

FinalPlumbing PermitRepairDec 2025
View Details
2025-157562 PP
๐Ÿ”งQualified Maintenace & Construction

Quick Actions

TDLR ID: TABS2022025417

Registered Accessibility Specialist

๐Ÿ“‹
MARK S,ROBINSON
RAS #1561
PO BOX 9063, AUSTIN, TX 78766